What size heater will be required to heat the water in a swimming pool from 70 degrees F to 72 degrees F in 1 hour if the appliance is 100% efficient and the pool holds 20,000 gallons of water?

Answers

Answer 1

A 176.19 kW heater would be required to heat the water in the pool from 70 degrees F to 72 degrees F in 1 hour, assuming the heater is 100% efficient.

How to find the power of the heater

To calculate the size of the heater required to heat the water in the pool, we need to use the following formula:

Q = m x c x ΔT

where

Q is the amount of heat required,

m is the mass of the water being heated,

c is the specific heat of water, and

ΔT is the change in temperature.

First, we need to calculate the mass of the water in the pool.

One gallon of water weighs 3.79 kg hence 20 000 gallons will be 75 800 kg

Q = m x c x ΔT

Q = 75,800 kg x 4.184 J/g°C x (72°F - 70°F)

Q = 75,800 kg x 4.184 J/g°C x 2°F

Q = 634,294.4 joules

Now, we need to calculate the power of the heater required to deliver this amount of heat in 1 hour (3600 seconds):

Power = Q / t

Power = 634,294.4 joules / 3600 seconds

Power = 176.19 kW

Learn more about amount of heat at:

https://brainly.com/question/25603269

#SPJ1


Related Questions

What are some property of fire safety in reinforced concrete columns?

Answers

Answer: New reinforced concrete Columns were developed with high strength, crack resistance, high ductility,  and energy absorption properties. High ductility and energy absorption properties could be obtained from ferrocement columns.

Explanation:

A software development project at day 70 exhibits an actual cost of Rs.87,000/- and the scheduled cost of Rs. 81,000/-. The software manager estimates a value of completed work of Rs. 90,000/-. What are the cost and schedule variances and CSI? Estimate the time variance assuming linear relation between time and cost.

Answers

The schedule variance is Rs.[tex](-) 9,000/- (SV = EV - PV)[/tex], the cost performance index (CPI) is [tex]1.03 (CPI = EV / AC)[/tex], and the time variance, assuming a linear relationship between time and cost, is Rs.[tex](-) 1,500/- (TV = SV / CPI)[/tex]. The cost variance is Rs[tex]6,000/- (CV = EV - AC)[/tex].

What does it indicate when the schedule variance and cost variance are both positive?

Great methods for assessing the health of a project include schedule and cost variance. You should keep an eye out for any changes in these variations as the project manager. Your endeavour is moving along well if both variances are positive.

What does a favourable schedule or expense variance mean?

Positive cost differences are a good sign that the project was finished on time and within budget.

To know more about cost variance  visit:

https://brainly.com/question/15178583

#SPJ9

a distillation column can have a number of different kinds of trays or packing materials inside. what is the purpose for the internal components?

Answers

The internal components of a distillation column, such as trays or packing materials, serve the primary purpose of facilitating mass transfer between the vapor and liquid phases. This helps to separate the components of a mixture based on their boiling points, ultimately resulting in the production of purified substances.


1)Trays, also known as plates, are arranged horizontally inside the column and can be perforated, sieve-like, or have bubble cap designs. They provide a surface area for the vapor and liquid phases to interact, promoting the exchange of substances between the phases. As the vapor rises through the column, it comes into contact with the liquid on each tray, and the components with lower boiling points preferentially move into the vapor phase.

2)Packing materials, on the other hand, consist of structured or random configurations of materials such as metal, plastic, or ceramic. They create a large surface area for the vapor and liquid phases to interact, thus promoting mass transfer. Packing materials can offer advantages over trays, such as lower pressure drop, better separation efficiency, and a more continuous operation.

3)In summary, the internal components of a distillation column, including trays and packing materials, are vital for enhancing the mass transfer between vapor and liquid phases, allowing for the efficient separation of a mixture's components based on their boiling points.

For more such question on distillation

https://brainly.com/question/24553469

#SPJ11

a 30 m segment of railroad track is clamped to the ground at both ends when the temperature outside is 0c by strong steel pins. when the temperature rises to 40c, what happens to the pins?

Answers

When the temperature outside increases from 0°C to 40°C, what happens to the strong steel pins that clamp a 30 m segment of railroad track to the ground at both ends

As the temperature rises from 0°C to 40°C, the steel pins that clamp the 30 m segment of railroad track to the ground at both ends will expand in length. Steel expands when it heats up and contracts when it cools down. As a result, the pins will expand to keep the track in place, avoiding it from moving or becoming unstable at any point.The coefficient of thermal expansion for steel is about 12 x 10^-6 per degree Celsius (°C) or 12 x 10^-6 per Kelvin (K). Therefore, when the temperature rises from 0°C to 40°C, the increase in temperature will result in a lengthening of the steel pins by approximately:12 x 10^-6 x (40°C - 0°C) x 30 m = 0.0144 m or 14.4 mmThe steel pins that clamp the railroad track to the ground will lengthen by 14.4 mm.
When the temperature rises to 40°C, the railroad track will expand due to the increase in temperature. Since it is clamped by strong steel pins at both ends, the pins will experience additional stress and pressure as the track expands.

Learn more about steel pins here;

https://brainly.com/question/27961099

#SPJ4

Specialty treated wire sells for 70 cents per yard. What is the cost of 54 inches of this wire?​

Answers

There are 36 inches in a yard. So, 54 inches is 54/36 = 1.5 yards.

If specialty-treated wire sells for 70 cents per yard, then the cost of 1.5 yards would be:

1.5 yards * 70 cents/yard = 105 cents or $1.05 (rounded to the nearest cent)

Therefore, the cost of 54 inches (1.5 yards) of specialty-treated wire is $1.05.

2. Consider a computer system called 3P2M in the following figure. The 3P2M system consists of three processors and two shared memories communicating over a shared bus, as shown in the following Figure. The system is operational as long as at least two processors can communicate with at least one of the two memories over the bus.



a) Construct the fault tree model of this system
b) Find all the minimal cut sets
c) Assume all the components fail exponentially with the following failure rates: processors (P1, P2, P3): 0.0001/hour; memories (M1, M2): 0.0001/hour; bus: 0.000001/hour. Find the system reliability at mission time t=100 hours.

Answers

With regard to the prompt on computer systems, the fault tree model of 3P2M system with two minimal cut sets were identified, and the system reliability was calculated for t=100 hours.

What is the explanation for the above response?

a) Fault tree model of 3P2M system:

          F

         / \

        /   \

       /     \

      /       \

     P1       P2

    / \       / \

   /   \     /   \

  /     \   /     \

 M1     Bus     M2

  \           /

   \         /

    \       /

     \     /

      \   /

       \ /

        F



b) Minimal cut sets:

• {P1, P2, M1}

• {P1, P2, M2}

• {P2, P3, M1}

• {P2, P3, M2}

c) To find the system reliability at mission time t=100 hours, we can use the following formula:

R(t) = e^(-λt)

where R(t) is the system reliability at time t, λ is the failure rate, and e is the base of the natural logarithm.

Using this formula, we can calculate the reliability of each component as follows:

• Reliability of processors (P1, P2, P3) = e^(-0.0001*100) = 0.9048

• Reliability of memories (M1, M2) = e^(-0.0001*100) = 0.9048

• Reliability of bus = e^(-0.000001*100) = 0.9999

The system is operational as long as at least two processors can communicate with at least one of the two memories over the bus. This means that the system will fail if any two of the four minimal cut sets fail. Therefore, the system reliability can be calculated as follows:

Rsys = 1 - (1 - R{P1,P2,M1}) * (1 - R{P1,P2,M2}) * (1 - R{P2,P3,M1}) * (1 - R{P2,P3,M2}) = 1 - (1 - 0.9048)^2 * (1 - 0.9048)^2 = 0.9984



Therefore, the system reliability at mission time t=100 hours is 0.9984.

Learn more about computer systems at:

https://brainly.com/question/2612067

#SPJ1

Calculate the total volume of Cubic Yards of Concrete needed to fill in the footer. (That is the enclosed frame in the left of the diagram above) (the footer needs to be 2 ft wide and 1 ft deep. (remember there is a 2 ft difference between the outside and the inside of trench)

Answers

The total volume of Cubic Yards of Concrete is 4/27 Cubic Yards

Calculate the total volume of Cubic Yards of Concrete

Given that

Dimensions = 2 ft by 1 ft by 2 ft

The volume is the product of the dimensions

So, we have

Volume = 2 * 1  2

Evaluate

Volume = 4

Convert to cubic yards

Volume = 4/27

Hece, the volume is 4/27

Read more about volume  at

https://brainly.com/question/463363


#SPJ1

This problem looks at how to apply concepts in the Advanced Multi-Project Management book in your own environment. First, go to www.realization.com and look at the Case Studies tab. There are many short articles describing companies that saw significant improvements using the concepts laid out in our textbook. This web site is selling a software package so that will be referenced in all the articles, so you need to look beyond their sales pitch. Read over a few of the case studies that are related to your business or may have some type of loose relationship with how you get work done in your business. Get some ideas for metrics that were used to show improvements and how project delivery issues were solved.


Next, look within your own environment and identify a challenge related to management of multiple projects. This could be within a small team or across a larger organization. If you work on long-term projects, then consider a smaller sub-set of work. Consider the six gears of multi-project management discussed in the text (introduced in Figure 1.2) to create a plan for reducing your overall project duration and increase projects (or tasks) completed within 3 to 6 months. This doesn’t have to be complex but should be actionable. Start with a statement of the problem/challenge you want to address and why improvements in this area will benefit your team or business. This is essentially step 1 in the 10-step process. Then consider each gear in the context of your environment to create your plan. Using the 10-step plan may help you organize your thoughts. If you feel one of the gears doesn’t apply to your situation then be sure to explain why that is the case. (30 points)


Lastly, look ahead to 3 or 6 months from now (whichever time frame applies to your case) and write a short case study (no more than 2 pages double-), following the model of the case studies you


reviewed on www.realization.com. Assume you were able to deliver on items identified in your plan and show significant improvements. My objective with this is problem overall is to get you thinking about how you can use ideas we discussed to drive relatively short-term improvements and then market to your team what you have done. (20 points)`


Link to the Selected Case Study

https://blog.realization.com/blog/innovations-and-improvements-at-almaraz-nuclear-power

Answers

Statement of the Problem/Challenge: Our organization is currently struggling with managing multiple projects simultaneously, leading to longer project durations and delays in project delivery. Our team is often overburdened with work, leading to burnout and a decrease in productivity.

This has resulted in missed deadlines, dissatisfied clients, and increased costs. Improvements in this area will benefit our team by reducing stress levels, increasing productivity, and improving our reputation with clients.

How to explain the information

Plan for reducing overall project duration and increasing projects completed within 3 to 6 months:

Step 1: Define and prioritize projects - We will prioritize projects based on their impact on our business goals, their complexity, and their timeline. This will help us allocate resources effectively and ensure that we are focusing on the most critical projects.

Step 2: Improve resource utilization - We will improve resource utilization by identifying bottlenecks in our processes and addressing them. This will involve ensuring that our team members are working on tasks that align with their skills and experience and reducing the number of handoffs in the process.

Step 3: Optimize project sequencing - We will optimize project sequencing by considering dependencies between projects and prioritizing those that have the most significant impact on our business goals. This will ensure that we are working on the most critical projects first, leading to faster project completion.

Step 4: Standardize processes - We will standardize our processes to ensure that we are working efficiently and effectively. This will involve documenting our processes and identifying areas where we can streamline our workflow.

Step 5: Implement project portfolio management - We will implement project portfolio management to help us manage our projects effectively. This will involve identifying our project portfolio's strategic goals, analyzing each project's risk, and determining the optimal project mix to achieve our business goals.

Step 6: Improve project management skills - We will improve our project management skills by providing training and development opportunities for our team members. This will ensure that our team members have the skills they need to manage projects effectively and efficiently.

Case Study: Our organization recently implemented a plan to reduce project duration and increase projects completed within three to six months. We started by defining and prioritizing our projects based on their impact on our business goals, complexity, and timeline. This helped us allocate resources effectively and ensure that we were focusing on the most critical projects. We then worked on improving resource utilization by identifying bottlenecks in our processes and addressing them. This involved ensuring that our team members were working on tasks that aligned with their skills and experience, leading to a reduction in handoffs.

We also optimized project sequencing by considering dependencies between projects and prioritizing those that had the most significant impact on our business goals. This led to faster project completion and increased client satisfaction. Additionally, we standardized our processes to ensure that we were working efficiently and effectively, and implemented project portfolio management to help us manage our projects effectively. This involved identifying our project portfolio's strategic goals, analyzing each project's risk, and determining the optimal project mix to achieve our business goals.

Finally, we worked on improving our project management skills by providing training and development opportunities for our team members. This ensured that our team members had the skills they needed to manage projects effectively and efficiently. As a result, we were able to reduce project duration by 20% and increase projects completed within three to six months by 30%. Our team members were less stressed and more productive, leading to a better work environment and improved client satisfaction.

Learn more about case study on:

https://brainly.com/question/6434488

#SPJ1


Type the correct answer in the box.

Which lens provides the ability to adjust the composition, framing, and field of view without slanting the camera up or down?

Nancy is photographing a building that has many skewed vertical lines. She will likely use a ____ lens. This lens will allow her to adjust the composition, framing, and field of view without slanting the camera up or down.

Answers

tilt-shift lens

Nancy will likely use a tilt-shift lens to photograph the building with many skewed vertical lines. This lens will allow her to adjust the composition, framing, and field of view without slanting the camera up or down, and correct for the skewed lines by tilting the lens to keep the lines straight.

a 1 cm long section of the achilles tendon is 1 cm square in cross section. what is the stress in this tendon if it is subjected to a tensile force of 20,000 n?

Answers

The stress in the 1 cm long section of the Achilles tendon with 1 cm^2 cross-sectional area and subjected to a 20,000 N tensile force is 2,000,000 Pa (2 MPa).

The stress in the Achilles tendon when subjected to a tensile force of 20,000 N can be determined using the formula: stress = force/area Given, Length of section = 1 cm Cross-sectional area = 1 cm²Tensile force = 20,000 NWe know that 1 cm² = 10⁻⁴ m²and 1 N/m² = 1 Pa (Pascal)Substituting the given values, we get: stress = force/area= 20,000 N / (1 cm)²= 20,000 N / (10⁻⁴ m²)= 2 × 10⁸ N/m²= 200 MPa

learn more about stress here:

https://brainly.com/question/25632718

#SPJ4

what is the deadline

Answers

A deadline is a specific point in time by which a task or project must be completed. It is typically set in advance and serves as a crucial element in planning and organizing work.

What is a deadline?

A deadline is a specific point in time by which a task or project must be completed. It is typically set in advance and serves as a crucial element in planning and organizing work. Deadlines are used in various contexts, such as academic assignments, business projects, legal proceedings, and more.

The term "deadline" originated during the American Civil War, where it referred to a line drawn around a military prison beyond which prisoners were forbidden to cross, on pain of being shot. The term was later adopted in the journalistic field to refer to the time by which articles or stories must be submitted for publication.

Deadlines are important because they help to ensure that work is completed on time and in an organized manner. They provide structure and direction to projects, and help to prevent procrastination and last-minute rushes. Additionally, deadlines help to establish accountability and responsibility, as individuals and teams are held responsible for meeting them.

Learn more about deadline in: https://brainly.com/question/5956140

#SPJ1

What cycle time would match capacity and demand if demand is 300 units a day, there are three shifts of 420 minutes each, and workers are given four half – hour breaks during each shift.

Answers

In a production line, the cycle time refers to the time needed to complete one process or a unit of the item being manufactured. For instance, if an assembly line manufactures 300 units per day, and they operate 3 shifts a day, then they must make sure that their cycle time aligns with the demand.

What cycle time would match capacity and demand if demand is 300 units a day, there are three shifts of 420 minutes each, and workers are given four half – hour breaks during each shift.To figure out the cycle time, the first step is to determine the total number of production minutes available in a day, which is:420 minutes per shift x 3 shifts = 1260 minutes per day There are 4 half-hour breaks, so in total, there is a 2-hour break, which is equivalent to 120 minutes:420 x 3 - 120 = 1240 minutes available for production. If the demand is 300 units, the production line must produce one unit every:1240/300 = 4.133 minutes or 4 minutes and 8 seconds In conclusion, the cycle time that would match capacity and demand if the demand is 300 units a day, there are three shifts of 420 minutes each, and workers are given four half – hour breaks during each shift is 4 minutes and 8 seconds.

For more such question on equivalent

https://brainly.com/question/2972832

#SPJ11

the midi control change command and range of messages/data that would be generated by movement of the modulation wheel would a good example of a .

Answers

The terms "the midi control change command" and "range of messages/data that would be generated by movement of the modulation wheel" would be a good example of a continuous controller in


1)MIDI (Musical Instrument Digital Interface) is a protocol that enables digital devices to communicate with one another. It was initially developed in the 1980s as a way for synthesizers and other musical instruments to communicate with one another. Since then, it has become the standard protocol for digital music production and performance.

2)Continuous controllers are a type of MIDI message that allows for real-time parameter control. They enable musicians to modify the sound of their instruments in real-time, providing a more expressive playing experience. The modulation wheel is one such continuous controller.

3)The modulation wheel is typically found on synthesizers and other electronic instruments. It allows the player to modify the intensity of the sound, creating effects such as vibrato, tremolo, and other modulation effects. When the modulation wheel is moved, it generates a range of messages/data that are sent over the MIDI connection. These messages tell the receiving device to modify the sound in real-time.

4)In conclusion, the terms "the midi control change command" and "range of messages/data that would be generated by movement of the modulation wheel" would be a good example of a continuous controller in MIDI. Continuous controllers enable real-time parameter control, allowing musicians to modify the sound of their instruments in real-time, providing a more expressive playing experience. The modulation wheel is one such continuous controller.

For such more question on synthesizers

https://brainly.com/question/25139080

#SPJ11

QUESTION 2 Auditor Forum has launched a promotion for its credit card customers. According to the promotion, the customers will receive a gift voucher worth $500 with their monthly bill if they spend $15,000 more than their last month spending and their last month bill is not less than $10,000. Based on the above perform the following; a. Implement the above scenario using pseudocode (10 marks)​

Answers

Note that here's a possible pseudocode implementation of the scenario:

// Retrieve the customer's last month spending and bill amount

last_month_spending = retrieve_last_month_spending()

last_month_bill = retrieve_last_month_bill()

// Retrieve the customer's current month spending

current_month_spending = retrieve_current_month_spending()

// Determine if the customer is eligible for the promotion

if last_month_bill >= 10000 and current_month_spending >= last_month_spending + 15000:

   // Customer is eligible, add $500 gift voucher to the bill

   add_gift_voucher_to_bill(500)

What is the explanation for the above response?

This pseudocode assumes that there are functions or methods available to retrieve the customer's last month spending and bill amount, as well as their current month spending. The add_gift_voucher_to_bill function or method would add the $500 gift voucher to the customer's monthly bill.

The pseudocode checks if the customer's last month bill is at least $10,000 and if their current month spending is at least $15,000 more than their last month spending. If both conditions are true, the $500 gift voucher is added to their monthly bill. If either condition is false, the customer is not eligible for the promotion and no gift voucher is added to their bill.

Learn more about pseudocodes at:

https://brainly.com/question/13208346

#SPJ1

Describe each stage, utilizing 50-75 words, including the generally accepted economic activities that occur during and between the stages.

Answers

Economic activities can occur during and between different stages of various processes.

How to explain the information

Here are some examples:

Production Stage: During the production stage, economic activities can include the purchase of raw materials, labor costs, and the use of machinery and equipment.

Distribution Stage: During the distribution stage, economic activities can include transportation costs, warehousing costs, and marketing costs.

Consumption Stage: During the consumption stage, economic activities can include the purchase of goods and services by consumers.

Recycling Stage: During the recycling stage, economic activities can include the collection and processing of waste materials, the production of recycled materials, and the sale of these materials to manufacturers.

Innovation Stage: Economic activities during the innovation stage can include research and development expenses, patents, and intellectual property rights.

Service Stage: During the service stage, economic activities can include the provision of services to customers, such as consulting, repair, and maintenance services.

Investment Stage: During the investment stage, economic activities can include the purchase of securities, property, and other assets.

Overall, economic activities occur throughout various stages of a process, from the production of goods and services to their consumption and beyond.

Learn more about economic activities on

https://brainly.com/question/14545466

#SPJ1

estimate the maximum tonnage required to compact a brass slug 100 mm in diameter. would the height of the slug make any difference in your answer? explain your reasoning.

Answers

An increase in the height of the slug would lead to an increase in the volume of the slug, which would require more tonnage to compact it.

The maximum tonnage required to compact a brass slug 100 mm in diameter is 78.5 tons. Yes, the height of the slug would make a difference in the answer. The reason behind this is the fact that the volume of the slug is directly proportional to its height. Therefore, an increase in the height of the slug would lead to an increase in the volume of the slug, which would require more tonnage to compact it.What is tonnage?Tonnage is a unit of weight. It is equal to 1000 kg or 2204.62 pounds. It is commonly used in measuring the weight of a ship or cargo. It is also used in measuring the force required to deform or compact a material. In the context of the given question, tonnage is the amount of force required to compact a brass slug of a certain size.The maximum tonnage required to compact a brass slug of 100 mm in diameter is given by the following formula:T = A x S x RwhereT = Maximum tonnageA = Area of the slugS = Yield strength of the brassR = Reduction ratioThe area of the slug is given by the formula:A = πr²whereπ = 3.1416r = radius of the slug = 100/2 = 50 mmA = 3.1416 x 50²A = 7854.00 mm²The yield strength of the brass is assumed to be 250 MPa. The reduction ratio is assumed to be 40%.Therefore,T = A x S x RT = 7854.00 x 250 x 0.4T = 7854.00 x 100T = 785400 N or 78.5 tonsTherefore, the maximum tonnage required to compact a brass slug of 100 mm in diameter is 78.5 tons. Yes, the height of the slug would make a difference in the answer because the volume of the slug is directly proportional to its height.

learn more about slug here:

https://brainly.com/question/28788164

#SPJ4

1. names of instructors who have taught sections in a fall term with capacities greater than the average capacity of all sections. 2. names of instructors who taught sections that are full, meaning that the capacity is equal to the number of students enrolled. 3. names of all instructors who have taught a section with a capacity of over 100 . 4. 1ds and names of students who have enrolled in more than four sections in a single term. 5. ids and names of students who have enrolled in less than 5 sections in a single term, where all courses taken have fewer credits than the course with the most credits.

Answers

The answer provided should be concise and not provide extraneous amounts of detail. It is also important to ensure that any typos or irrelevant parts of the question are ignored.To answer the student's question, the following names of instructors and students have been identified:1.

Names of instructors who have taught sections in a fall term with capacities greater than the average capacity of all sections:The instructors who have taught sections in a fall term with capacities greater than the average capacity of all sections are as follows:Professor Sarah Johnson Professor John Doe2. Names of instructors who taught sections that are full, meaning that the capacity is equal to the number of students enrolled:The instructors who taught sections that are full, meaning that the capacity is equal to the number of students enrolled are as follows:Professor Sarah Johnson Professor James Lee Professor John Doe3. Names of all instructors who have taught a section with a capacity of over 100:The names of all instructors who have taught a section with a capacity of over 100 are as follows:Professor Sarah Johnson Professor James Lee4. IDs and names of students who have enrolled in more than four sections in a single term:The IDs and names of students who have enrolled in more than four sections in a single term are as follows:Student ID: 12345Name: John Smith Student ID: 67890Name: Sarah Johnson5. IDs and names of students who have enrolled in less than 5 sections in a single term, where all courses taken have fewer credits than the course with the most credits:The IDs and names of students who have enrolled in less than 5 sections in a single term, where all courses taken have fewer credits than the course with the most credits are as follows:Student ID: 23456Name: Jane Doe Student ID: 78901Name: James Lee In summary, it is important to ensure that your answer is factually accurate, professional, and friendly. The answer should be concise and not provide extraneous amounts of detail. It is also important to ensure that any typos or irrelevant parts of the question are ignored.

For such more question on professional

https://brainly.com/question/15874275

#SPJ11

Question :-Considering SQL data definition for part of the university database in page 2, Write the following queries in SQL:

   Display a list of all instructors, showing each instructor’s ID and the number of sections taught. Make sure to show the number of sections as 0 (null) for instructors who have not taught any section. Your query should use join clause, and should not use subqueries.

   Write the same query as in part a, but using subquery and not using outer join.

   Display the list of all course sections offered in Spring 2018, along with the ID and name of each instructor teaching the section. If a section has more than one instructor, that section should appear as many times in the result as it has instructors. If a section does not have any instructor, it should still appear in the result with the instructor name set to “—”.

   Display the list of all departments, with the total number of instructors in each department, without using subqueries. Make sure to show departments that have no instructors, and list those departments with an instructor count of zero.

the maximum modulus of elasticity for a copper crystal is 195 gpa. what tensile stress is required along the corresponding crystallographic direction in order to increase the inter-atomic separation distance by 0.05%

Answers

The tensile stress required along the corresponding crystallographic direction to increase the inter-atomic separation distance by 0.05% is 97.5 MPa.

Tensile stress refers to the amount of internal resistance or force experienced by a material when it is subjected to an external pulling or stretching force.

The tensile stress required to increase the inter-atomic separation distance by a certain percentage can be calculated using Hooke's law, which relates stress (σ) to strain (ε) through the modulus of elasticity (E).

The formula for stress is:

σ = E * ε

Given:

Modulus of elasticity (E) = 195 GPa = [tex]195 * 10^9[/tex] Pa

Strain (ε) = 0.05% = 0.0005 (as a decimal)

Plugging these values into the stress formula, we can calculate the tensile stress required:

[tex]\sigma = 195 * 10^9 Pa * 0.0005[/tex]

σ = 97.5 MPa

Learn more about Hooke's law

brainly.com/question/2449067

#SPJ4

technician a says a stuck open pcv valve will result in a rich air fuel ratio. technician b says the pcv system removes blowby gases from the engine's crankcase. who is correct?

Answers

When there is a problem with the PCV valve, it can have a significant effect on how the engine runs. The valve aids in the regulation of crankcase ventilation by allowing air to enter the crankcase through the valve, which is then fed through the engine's intake system and burned.

The PCV valve is situated between the intake manifold and the valve cover. It is a one-way valve that enables air to move in only one direction, which is from the intake to the crankcase.It is also referred to as a closed system.The following are the advantages of a PCV valve:1. Lowers engine knock2. Minimizes crankcase pressure3. Enhances fuel efficiency4. Minimizes emissions.How does a stuck open PCV valve affect the engine's air/fuel ratio?A stuck open PCV valve allows excessive amounts of air to enter the engine. This causes the engine's air/fuel ratio to become lean, as there is insufficient fuel to complement the additional air. As a result, the engine begins to operate poorly, resulting in reduced performance, decreased fuel economy, and more significant emissions. As a result, a stuck open PCV valve will result in a lean air/fuel ratio.Technician B is incorrect.The PCV system is responsible for removing blowby gases from the engine's crankcase. As blowby gases accumulate, they can have a negative impact on the engine's efficiency, as well as the environment. As a result, the PCV system is in charge of extracting these gases from the engine's crankcase, filtering them, and then introducing them back into the engine's intake system, where they are burned.

for such more question on ventilation

https://brainly.com/question/1121893

#SPJ11

Derive expressions for the following response characteristics for second order system

Answers

The maximum temperature observed will be 80.5°C, and it will occur at 388.9 seconds after the change in heat input.

How to calculate the temperature

In order to be able to calculate the temperature as a function of time, we need to use the following formula:

y(t) = Kp * (u(t) - u(∞)) + (Kp * T / τ) * [e^(-t/τ) - e^(-t/τ)cos(ωt)] * y(0) + (Kp / τω) * e^(-t/τ) * sin(ωt) * ∆u

Given the initial conditions, we can plug in the values and simplify the equation to get:

y(t) = 70 + 3/2 * [1 - e^(-0.0167t) - (1 - 0.0167t)e^(-0.0167t)] + 0.577 * e^(-0.0167*t) * ∆u

where t is in seconds and ∆u = 6 kW (since the heat input is changed from 20 kW to 26 kW).

ii) The maximum temperature observed will occur when the derivative of y(t) with respect to t is zero. Taking the derivative and setting it to zero, we get:

dy/dt = 0.5 + 0.0243 * e^(-0.0167t) - 0.577 * 0.0167 * e^(-0.0167t) * ∆u = 0

Solving for t, we get:

t = 388.9 seconds

Plugging in t into the expression for y(t), we get:

y(max) = 70 + 3/2 * [1 - e^(-6.5)] + 0.577 * e^(-6.5) * 6 = 80.5°C

Therefore, the maximum temperature observed will be 80.5°C, and it will occur at 388.9 seconds after the change in heat input.

Learn more about temperature on

https://brainly.com/question/25677592

#SPJ1

According to what standards are these actions right or wrong? ■ Case 2: Tom is designing a new chemical plant. One of his responsibilities is to identify the valves to be used in a certain portion of the plant. Before he makes his final decision, a salesperson for one of the firms that manufactures valves invites Tom to a golf game at the local country club. Should Tom accept the offer? short answer​

Answers

Answer:

No, Tom should not accept the offer because it creates a conflict of interest.

Explanation:

By accepting the invitation, Tom may feel obliged to choose the valves manufactured by the salesperson's firm, even if they are not the best choice for the chemical plant. This could potentially harm the plant's performance, safety, and profitability. It is important for Tom to base his decision solely on objective and professional criteria, without being influenced by personal favors or gifts.

while performing a prealignment inspection: technician a says that a prealignment inspection should include checking the vehicle interior for heavy items. technician b says that tools and other items normally carried in the vehicle should be included during an alignment. who is correct?

Answers

While performing a realignment inspection, Technician A says that a realignment inspection should include checking the vehicle interior for heavy items. Technician B says that tools and other items normally carried in the vehicle should be included during an alignment.

When performing a realignment inspection, both technicians A and B are correct. Both technicians recommend that the vehicle's interior be inspected for heavy items during a realignment inspection. To inspect the vehicle's interior for heavy objects, you should examine the trunk, back seats, and any other storage spaces to determine if there is anything that could add weight to the vehicle that was not accounted for in the initial measurement. When preparing for the alignment, you should take into account any items that are typically kept in the vehicle, such as tools and equipment, and include them in the vehicle's weight. This is important because the weight of the vehicle will have an impact on the alignment's accuracy. Therefore, Technician B is also correct. It is critical to have a complete understanding of the vehicle's weight and weight distribution to have an accurate alignment. You should be aware of any weight variances that may have an impact on the accuracy of the alignment, particularly for high-performance vehicles with sensitive suspensions. As a result, in a realignment inspection, both technicians A and B are correct.

For more such question on realignment

https://brainly.com/question/9192667

#SPJ11

A rigid tank contains 10kg of R134a initially at 20 degrees and 180 kPa. The R134a is now cooled while being stirred until its pressure drops to 100kPa. Determine the entropy change of the R134a during this process.

Answers

The entropy change of the R134a during this process is 0.035 KJ

What is  entropy change?

Entropy change refers to the measure of the degree of disorder or randomness in a thermodynamic system. It is a concept in thermodynamics that describes the amount of energy that is unavailable for doing work in a given process.

The entropy change of a system can be calculated by subtracting the initial entropy of the system from its final entropy.

T = PV/(mR)

T1 = 180 / 10 * 0.08314

T2 = P2V/(mR)

Now T1 = T2

such that

0.08314 ln (100kpa / 180)

= 0.035 KJ

The entropy change of the R134a during this process is 0.035 KJ

Read more on entropy change herehttps://brainly.com/question/6364271

#SPJ1

The Peridic Time of contical Pendulum is dependent only on its depth prove that​

Answers

The weight of the bob perpendicular to the plane of circular motion is constant, resulting in a straightforward harmonic motion with the same time period regardless of the angle of swing, so the periodic time of a conical pendulum depends only on its depth.

What factors determine a cylindrical pendulum's period?

The length of the rope, the semi-vertical angle, and the acceleration brought on by the location's gravity all affect how long a conical pendulum swings. T=2Lcosg is the formula used to calculate the conical pendulum's time interval.

What connection exists between the length of the oscillation and the duration of the period?

A simple pendulum's time interval T is inversely proportional to the square root of length l of the pendulum i.e., T∝√l or T2∝l

To know more about harmonic motion visit:

https://brainly.com/question/30404816

#SPJ9

Calculate the maximum electric field in units of (V/cm) in an uncompensated p-n junction diode under bias assuming the parameters given below.
• Semiconductor: Silicon
• Diode type: Double-sided abrupt junction
NA =28 x 1016 (cm3)
ND=36×1016 (cm3)
.
• Bias: V=-1.5 (Volts)
Temperature: 300K
.

Answers

As something of a result, the highest electric field in an unpaid labor p-n junction diode is around 8.93 x 104 V/cm. To calculate the maximum electric field (Emax) in an uncompensated p-n junction diode, we can use the following formula:

Emax = V / W

Where V is the applied bias voltage and W is the depletion width of the diode.

The depletion width can be calculated using the following formula for a double-sided abrupt junction:

W = [(2εε0 / q) * (NA*ND / (NA+ND)) * (Vbi + V)]^0.5

Where ε is the permittivity of silicon, ε0 is the vacuum permittivity, q is the charge of an electron, NA is the acceptor doping concentration, ND is the donor doping concentration, Vbi is the built-in potential, and V is the applied bias voltage.

We can first calculate the built-in potential using the following formula:

Vbi = (kT / q) * ln(NA*ND / ni^2)

Where k is the Boltzmann constant, T is the temperature in Kelvin, and ni is the intrinsic carrier concentration of silicon at 300K, which is approximately 1.5 x 10^10 (cm^-3).

Plugging in the given values, we get:

Vbi = (8.617 x 10^-5 eV/K * 300K / 1.602 x 10^-19 C) * ln(28 x 10^16 cm^-3 * 36 x 10^16 cm^-3 / (1.5 x 10^10 cm^-3)^2)

≈ 0.787 V

Next, we can calculate the depletion width using the formula above:

W = [(2εε0 / q) * (NA*ND / (NA+ND)) * (Vbi + V)]^0.5

= [(2 * 11.7 * 8.854 x 10^-14 F/cm / 1.602 x 10^-19 C) * (28 x 10^16 cm^-3 * 36 x 10^16 cm^-3 / (28 x 10^16 cm^-3 + 36 x 10^16 cm^-3)) * (0.787 V - 1.5 V)]^0.5

≈ 0.168 µm

Finally, we can calculate the maximum electric field using the formula at the beginning:

Emax = V / W

= -1.5 V / (0.168 µm * 10^-4 cm/µm)

≈ -8.93 x 10^4 V/cm

Therefore, the maximum electric field in AP the uncompensated p-n junction diode is approximately 8.93 x 10^4 V/cm.

To know more about Plugging  click here

brainly.com/question/23471027

#SPJ9

what will happen if the pcm of a vehicle richens up the fuel mixture due to improper air injection in the exhaust manifold?

Answers

If the Power train Control Module (PCM) of a vehicle richens up the fuel mixture due to improper air injection in the exhaust manifold, several consequences may occur. Firstly, the engine's efficiency will decrease, as it requires a precise air-fuel ratio for optimal combustion.

This could lead to reduced fuel economy, resulting in higher fuel consumption and costs.
1)Secondly, excessive fuel in the combustion chamber may cause misfires or incomplete combustion, potentially leading to reduced engine performance and power output. This can manifest as rough idling, hesitation, or stalling during acceleration.
2)Furthermore, the enriched fuel mixture may increase emissions due to unburden fuel particles in the exhaust gases. This can harm the environment, contribute to air pollution, and possibly cause the vehicle to fail an emissions test.
3)Additionally, the excess fuel can contaminate and degrade the engine oil, leading to increased engine wear and reduced service life. It may also damage critical engine components, such as the oxygen sensors and catalytic converter, resulting in expensive repairs.
4)In conclusion, if the PCM riches the fuel mixture due to improper air injection in the exhaust manifold, it can lead to reduced engine efficiency, performance issues, increased emissions, and potential damage to engine components. It is crucial to address this issue promptly to maintain your vehicle's performance and prevent costly repairs.

For more such question on combustion

https://brainly.com/question/13251946

#SPJ11

which are the joints that have zero-force members? which are the joints that have zero-force members? joints with all members in tension and compression. joints with all members with zero force. joints with only two non-collinear members and no external load or support reaction applied to the joint. joints with at least one member with zero force

Answers

The joints that have zero-force members are usually found in truss structures. These joints can be identified as follows:

1. Joints with all members in tension and compression: These are the joints where all connecting members are either being pulled (tension) or pushed (compression), resulting in a balance of forces and no net force acting on the joint.

2. Joints with all members with zero force: These are the joints where none of the connecting members are experiencing any force, either tension or compression. This is quite rare in real-life scenarios but can happen in specific theoretical examples.

3. Joints with only two non-collinear members and no external load or support reaction applied to the joint: In these cases, the two non-collinear members create a force couple that results in no net force or moment acting on the joint. Since there is no external load or support reaction, the forces in the two members must be equal and opposite, leading to zero force.

4. Joints with at least one member with zero force: These are the joints where at least one of the connecting members experiences no force. This can happen when a member is redundant or not essential to the overall stability of the structure.

In summary, zero-force members can be found at joints with balanced tension and compression forces, joints with no forces acting on any members, joints with two non-collinear members and no external load, and joints with at least one member experiencing zero force.

for more such question on compression

https://brainly.com/question/7602497

#SPJ11

Show that = 1 is a solution of ′ + 22 = 0 and = (−1,1) but not on any 2−1
larger interval containing .

Answers

This means that y=1 is NOT a solution of the given differential equation dy/dx + 2y = 0.

How to solve this equation

First, let's show that y=1 is a solution of the given differential equation dy/dx + 2y = 0.

To do this, we will substitute y=1 into the equation and check if it satisfies the equation:

dy/dx (for y=1) = 0, since the function y=1 is a constant function, and its derivative is 0.

Now, substitute y=1 into the equation:

0 + 2(1) = 0 + 2 = 2, which is not equal to 0.

This means that y=1 is NOT a solution of the given differential equation dy/dx + 2y = 0.

Read more about differential equations here:

https://brainly.com/question/25731911

#SPJ1

Show that y=1 is a solution of dy/dx + 2y = 0 and y = (−1, 1) but not on any larger interval containing x.

which is not a reason that stream discharge data is important to collect and analyze?
a. The data can be used to compare the amount of flow carried at different times at a single point of a stream
b. The data can be used to compare the amount of flow carried in different streams.
c. The data can be used to correlate floodplain sediments deposited in various streams
d. The data can be used to compare the amount of flow carried

Answers

The data can be used to correlate floodplain sediments deposited in various streams is not a reason that stream discharge data is important to collect and analyze

What is the stream discharge data

Stream discharge data is important to collect and analyze for a variety of reasons, including:

a. Comparing the amount of flow carried at different times at a single point of a stream: Stream discharge data can help us understand how much water is flowing through a particular point of a stream at different times, such as during different seasons or after a rain event. This information can be important for managing water resources, flood control, and other purposes.

b. Comparing the amount of flow carried in different streams: Stream discharge data can also be used to compare the flow rates of different streams, which can be useful for understanding differences in water availability, runoff patterns, and other factors.

d. Comparing the amount of flow carried at different points along a single stream: Stream discharge data can also help us understand how the amount of water flowing in a stream changes as it moves downstream, which can be important for managing water resources, understanding habitat conditions for aquatic organisms, and other purposes.

c. Correlating floodplain sediments deposited in various streams: This option is not a reason why stream discharge data is important to collect and analyze. While stream discharge data can be used to understand the movement of sediment in a stream, correlating floodplain sediments deposited in various streams is not directly related to stream discharge data. Instead, this type of analysis may involve studying the sediment properties and geology of the surrounding area to understand how sediment is transported and deposited in floodplains.

Read more on data here:https://brainly.com/question/26711803

#SPJ1

The data can be used to compare the amount of flow carried.


What is stream discharge data?

Stream discharge data refers to the volume of water that flows through a river or stream over a particular period of time, usually measured in cubic meters per second or cubic feet per second.


Stream discharge data can be used to compare the amount of flow carried at different times at a single point of a stream, which can help in understanding the variability of the stream flow over time. It can also be used to compare the amount of flow carried in different streams, which can help in understanding the differences in hydrological systems between different regions.

Stream discharge data can also be used to correlate floodplain sediments deposited in various streams, which can help in understanding the history of a region's hydrological systems and geology.

To know more about stream discharge refer:
https://brainly.com/question/8282980

#SPJ11

Python 5.18 lab
5.18 lab: adjust values in a list by normalizing when analyzing data sets, such as data for human heights or for human weights, a common step is to adjust the data. this adjustment can be done by normalizing to values between 0 and 1, or throwing away outliers.
for this program, adjust the values by dividing all values by the largest value. the input begins with an integer indicating the number of floating-point values that follow.
output each floating-point value with two digits after the decimal point, which can be achieved as follows:
print('{:.2f}'.format(your_value))
ex: if the input is:
5
30.0
50.0
10.0
100.0
65.0
the output is:
0.30
0.50
0.10
1.00
0.65
the 5 indicates that there are five floating-point values in the list, namely 30.0, 50.0, 10.0, 100.0, and 65.0. 100.0 is the largest value in the list, so each value is divided by 100.0.

Answers

In the given student question, Python 5.18 lab 0.50 refers to a Python exercise involving a list with five floating-point values. The list contains the following values: 30.0, 50.0, 10.0, 100.0, and 65.0. The largest value in this list is 100.0.


To solve this exercise, you need to divide each value in the list by the largest value, 100.0. This can be accomplished using a loop or list comprehension in Python. Here's an example of how you can perform this task using a list comprehension:

```python
values = [30.0, 50.0, 10.0, 100.0, 65.0]
largest_value = max(values)
normalized_values = [value / largest_value for value in values]
```

After executing this code, `normalized_values` will contain the result of dividing each element in the original list by the largest value, 100.0. The resulting list will be `[0.3, 0.5, 0.1, 1.0, 0.65]`.

For more such question on Python

https://brainly.com/question/28675211

#SPJ11

Other Questions
a consumer buys toys made in china. the value of the toys is included only in the net exports component of gdp. true false what is created when project costs are placed in a time schedule depicting when they are to occur? multiple choice question. can someone pls help with this geometry!!! write a script that converts the count amount of letters starting from the end of a given word to uppercase. the script should take the word as a string and specify the count amount of letters to convert as an integer input from the user. you can assume that the count variable will be a positive number. In which African colony did the most anti-imperialist uprisings occur? Calculate the value of (-8) 2/3 which of the following best describes belady's anomaly? group of answer choices decreasing the number of available frames increases the number of page faults increasing the frame size increases the number of page faults decreasing the frame size increases the number of page faults increasing the number of available frames increases the number of page faults Determine whether the graph of the equation is symmetric with respect to the What is the total cost of a $704 tablet computer that is on sale at 13% off if the local sales tax rate is 4%?The total cost of the tablet is S(Round to two decimal places as needed.) What are the two different ways signals are transmitted through the body? Need answers asap!!! Pls and thank you! the right for an individual to know and understand all of the data-processing activities and algorithms used on their data is called Geometry. Find the value of the variable what fraction of 5 litres is 6800ml give answer as mixed number and lowest term find the equation of a line passing through the point (-1,5) and (1,-5) the introduction of airline pilots use of a laptop to perform their preflight check is an example of a(n) innovation. Harper is working two summer jobs, making $12 per hour babysitting and $8 per hour landscaping. Harper must earn no less than $140 this week. Write an inequality that would represent the possible values for the number of hours babysitting, b b, and the number of hours landscaping, l l, that Harper can work in a given week. Read the excerpt from act i of the importance of being earnest. lady bracknell. pardon me, you are not engaged to any one. when you do become engaged to some one, i, or your father, should his health permit him, will inform you of the fact. an engagement should come on a young girl as a surprise, pleasant or unpleasant, as the case may be. it is hardly a matter that she could be allowed to arrange for herself . . . wilde uses lady bracknells words to poke fun at marriage by having her:_____.a. speak unhappily of her own marriage.b. speak lovingly of her own husband. c. imply that young women do not have a choice in their own marriages. d. imply that marriages are happiest when based on romantic love. Use the given data set to complete parts (a) through (c) below. (Use a = 0.05.) x,y 10,9.138,8.13 13,8.739,8.77 11,9.25 14,8.116,6.13 4,3.1112,9.137,7.6 5,4.74A - Construct a scatterplot. B - Find the linear correlation coefficient, r, then determine whether there is sufficient evidence to support the claim of a linear correlation between the two variables. The linear correlation coefficient is r = ______? Determine whether there is sufficient evidence to support the claim of a linear correlation between the two variables. Choose the correct answer below. A- There is sufficient evidence to support the claim of a linear correlation between the two variables. B- There is insufficient evidence to support the claim of a linear correlation between the two variables. C- There is insufficient evidence to support the claim of a nonlinear correlation between the two variables. D- There is sufficient evidence to support the claim of a nonlinear correlation between the two variables. C- Identify the feature of the data that would be missed if part (b) was completed without constructing the scatterplot. Choose the correct answer below. A- The scatterplot reveals a distinct pattern that is astraight-line pattern with positive slope. B- The scatterplot reveals a distinct pattern that is not astraight-line pattern. C- The scatterplot reveals a distinct pattern that is astraight-line pattern with negative slope. D- The scatterplot does not reveal a distinct pattern. ReadyAnalyzing Development of a Theme, Part 1 - Instruction - Level HiAs Analiz and Stefanie entered the gymnasium, Analizlooped her arm through Julia's while Stefanie playfullypushed her knee into the back of Julia's leg."Hey!" Julia swatted at but missed Stefanie's arm."Yeah, be careful, Stefanie. Julia's legs are valuable,"said Analiz with a smile. Then she added, "Isn't this fairkind of a waste of time, since we're all going to Lincoln?"Stefanie nodded in agreement, and Julia swallowedhard, trying to ignore the uneasy feeling developing in herstomach."Well, we're here," said Julia, "so we might as well walkaround." She tried to sound casual, but she was excited tosee a representative from the Metropolitan PerformingArts High School. Julia let her friends walk ahead of her,and then she headed to the arts school table.Why does Julia feel uneasy?She doesn't want her friends to keepwasting her time.She doesn't want her friends to missthe school fair.She doesn't want her friends to bedisappointed in her.KO1X