An engine is operated by burning gas which puts 75000 J of heat into the engine. The engine is used to slowly lift a 20 kg mass up to a height of 110 m. The total energy of the engine does not change. How much heat is rejected by the engine into the atmosphere?
SHOW STEPS PLEASE!

Answers

Answer 1

The heat rejected by the engine into the atmosphere is 53440 J.

How to calculate heat rejected by the engine

According to the law of conservation of energy, the total energy of the system (engine + mass) is conserved.

The energy supplied to the system by the engine is used to lift the mass against gravity and to do some work against frictional forces, which ultimately gets dissipated as heat energy into the atmosphere.

The work done in lifting the mass against gravity is given by:

Work = Force x Distance = m x g x h

where

m = mass of the object = 20 kg

g = acceleration due to gravity = 9.8 m/s^2

h = height lifted = 110 m

So, Work = 20 x 9.8 x 110 = 21560 J

The heat energy supplied by the engine is used to do the work and overcome the frictional forces. Therefore, the remaining heat energy must be dissipated into the atmosphere. So, the heat rejected by the engine is:

Heat rejected = Heat supplied - Work done

= 75000 - 21560

= 53440 J

Learn more about  law of conservation of energy at:

https://brainly.com/question/24772394

#SPJ1


Related Questions

Write the code that will create a 50 x 50 grid of nodes and an output function that displays the row and column of each node in the grid after it is created.Submit a single cpp file that shows the creation and display of the canvas.
This is the pseudocode :
row1, row2 and p are pointers
row1 = head
//create first row
for (1 -> 50)
p = new node
//row2 point to node to the right of curent node (row 1)
//link left and right
connect p left to row1
connect row1 right to p
end loop
reset row 1 to head of grid
//create row 2 - 50
for (2 -> 50)
//create first node in row and link it up/down
row2 = new node
connect row2 up to row1
connect row1 down to row2
//hold beginning of row
move row1 to row2
//create rest of nodes on row
for (2 -> 50)
//row2 will always point to previous node in row
p = new node
connect p left to previous node
connect previous node right to p
connect p up to node above (row2 up right)
connect node above p down to p
move row2 to the right
end loop
end loop

Answers

Here's the code that will create a 50 x 50 grid of nodes and an output function that displays the row and column of each node in the grid after it is created:

```
#include

using namespace std;

struct node {
   int row;
   int col;
   node* up;
   node* down;
   node* left;
   node* right;
};

node* createGrid() {
   // Create head node
   node* head = new node;
   head->row = 0;
   head->col = 0;
   head->up = NULL;
   head->down = NULL;
   head->left = NULL;
   head->right = NULL;

   // Create first row
   node* row1 = head;
   for (int i = 1; i <= 50; i++) {
       node* p = new node;
       p->row = 1;
       p->col = i;
       p->up = NULL;
       p->down = NULL;
       p->left = row1;
       p->right = NULL;
       row1->right = p;
       row1 = p;
   }

   // Reset row1 to head of grid
   row1 = head;

   // Create rows 2-50
   for (int i = 2; i <= 50; i++) {
       // Create first node in row and link it up/down
       node* row2 = new node;
       row2->row = i;
       row2->col = 1;
       row2->up = row1;
       row2->down = NULL;
       row2->left = NULL;
       row2->right = NULL;
       row1->down = row2;
       row1 = row2;

       // Create rest of nodes in row
       node* prev = row2;
       for (int j = 2; j <= 50; j++) {
           node* p = new node;
           p->row = i;
           p->col = j;
           p->up = prev->up->right;
           p->down = NULL;
           p->left = prev;
           p->right = NULL;
           prev->right = p;
           prev = p;
       }
   }

   return head;
}

void displayGrid(node* head) {
   node* curr = head;

   while (curr != NULL) {
       node* row = curr;
       while (row != NULL) {
           cout << "Row: " << row->row << ", Col: " << row->col << endl;
           row = row->right;
       }
       curr = curr->down;
   }
}

int main() {
   node* head = createGrid();
   displayGrid(head);

   return 0;
}
```

The `createGrid` function uses the pseudocode provided to create a 50 x 50 grid of nodes. Each node has a `row` and `col` value to track its position in the grid, as well as pointers to its up, down, left, and right neighbors.

The `displayGrid` function uses nested loops to iterate through each row and column of the grid and output the row and column values.

In the `main` function, we call `createGrid` to create the grid and store its head node in the `head` variable. Then we call `displayGrid` to output the row and column values of each node in the grid.

Learn more about loops here:

https://brainly.com/question/30494342

#SPJ11

True/False? a three-bend saddle is a saddle consisting of a center bend and two side bends with the center bend having twice the angle of the side bends.

Answers

False. A three-bend saddle is a saddle consisting of three bends or curves, but there is no requirement for the center bend to have twice the angle of the side bends. The angles of the bends can vary depending on the design and application of the saddle.

If you believe the system is not determinate, you must:Specify why the system is not determinate.Add elements to the precedence relation to make it determinate.

Answers

To answer the question about a system that is not determinate:

1. A system is not determinate if it lacks a unique and predictable solution or outcome. This could be due to insufficient constraints, inconsistent information, or the presence of multiple solutions that satisfy the given conditions.

2. To make a non-determinate system determinate, you should add elements to the precedence relation. The precedence relation defines the order in which tasks or events must occur. By introducing new constraints or relationships between the elements, you can reduce ambiguity and ensure a unique solution or outcome. Follow these steps:

  a. Identify the elements in the system that are causing indeterminacy.
  b. Determine the necessary constraints or relationships that will provide a clear order or hierarchy among these elements.
  c. Add the new constraints or relationships to the precedence relation, ensuring that they do not contradict any existing information.
  d. Verify that the modified system now has a unique and predictable solution or outcome, making it determinate.

Learn more about hierarchy here:

https://brainly.com/question/9647678

#SPJ11

What is the solution to this?

Answers

A vector is a quantity or phenomenon that has two independent properties: magnitude and direction. The term also denotes the mathematical or geometrical representation of such a quantity.

It is claimed that two vectors are equal if their magnitude and direction are the same. The study of mathematics, physics, and engineering are all dependent on it. The basic ideas of vector algebra may be used to add one vector to another vector head to tail.

As follows

|v⃗ |=|v1→+v2→|

one which is held

|v| = v21 + v22 + 2 v1 v 2 cos,

angle that the two vectors make with one another. cognizant of

v22 = 144 and v21 = 81 correspondingly.

2(9)(12)cosθ=216(−7,591×10−3)=−1639,656×10−3

so that we have

144+81−1,639656=223,360344

√=14,94524486=|v⃗ |

The angle being taken

θ=(90−63)+(90−α) \s,

In order for the angle we compute to be the angle that really results, for instance, an angle where is the angle between the positive axe-y and the v1.

learn more about vectors here:

https://brainly.com/question/29740341

#SPJ1

How do you write a method statement for: 1. Site Setup and Temporary works in construction?

Answers

A method statement for site setup and temporary works in construction should include the following steps:

1. Identify the scope of work and establish the project requirements for site setup and temporary works. This includes the location, size, and nature of the project, as well as any specific regulatory or safety requirements.

2. Develop a detailed plan for site setup and temporary works, including timelines, resources, and responsibilities. This should include a list of all temporary works required, such as access roads, fencing, and scaffolding.

3. Identify potential hazards and risks associated with site setup and temporary works, and develop a risk assessment and mitigation plan. This should include measures to ensure the safety of workers and the public, as well as measures to protect the environment.

4. Obtain all necessary permits and approvals, including building permits, environmental permits, and safety certifications.

5. Develop a site-specific safety plan and ensure all workers are properly trained and equipped to carry out the work safely. This should include safety procedures for working at heights, using heavy equipment, and handling hazardous materials.

6. Monitor the progress of site setup and temporary works, and make adjustments as necessary to ensure the work is completed on time, within budget, and to the required quality standards.

7. Conduct regular inspections and audits to ensure that all site setup and temporary works are in compliance with regulatory and safety requirements.

8. Document all site setup and temporary works activities, including any incidents or accidents that occur, and use this information to improve future projects.

Overall, the method statement for site setup and temporary works in construction should be a detailed plan that outlines all the necessary steps, resources, and safety measures required to ensure the successful completion of the project. It should be regularly reviewed and updated as necessary to ensure that the work is carried out safely and efficiently.

in the aim content planning process, you develop your information and ideas by

Answers

The aim of the content planning process is to create a content strategy that aligns with your organization's goals and objectives. This process involves developing information and ideas through research, analysis, and creative thinking.

The process typically includes the following steps:
1. Define your audience: In this step, you need to identify the audience you want to target with your content. This can be done by analyzing your existing customer base or by conducting market research to understand the needs and interests of your target audience.
2. Set goals and objectives: You need to establish clear goals and objectives for your content marketing efforts. These goals should be specific, measurable, achievable, relevant, and time-bound (SMART). For instance, your goal may be to increase brand awareness, generate leads, or boost sales.
3. Develop a content strategy: Once you have identified your audience and set your goals, you need to develop a content strategy that will help you achieve these objectives. This involves identifying the types of content you will create, the channels you will use to distribute it, and the key messages you want to communicate.
4. Create a content calendar: A content calendar is a schedule that outlines the topics, formats, and channels you will use to distribute your content over a specified period. This helps ensure that your content is timely, relevant, and consistent.
5. Execute your plan: Once you have developed your content plan, you need to execute it by creating and publishing your content. You should also track your progress and adjust your strategy as needed to ensure that you are meeting your goals.

For such  more questions on planning process:

brainly.com/question/27989299

#SPJ11

Fig. 1. shows a support system for a wooden balcony, knowing that the tension is 425 lb. in cable AB and 510 lb. in cable AC, determine the magnitude and direction of the resultant of the forces exerted at A by the two cables.

Answers

Answer: point A[{-40i + 0j + 45k}], B[{0i + 0j + 60k}], C[{ 60i + 0j + 60k}] from there you can now find the Magnitudes then The unit vectors multiplied by the forces provided 425lb AB and 510lb AC.

Explanation:

in two position control the area between the high and low limits where there is no change in the position of the final control element is called the

Answers

In two-position control, the area between the high and low limits where there is no change in the position of the final control element is called the Deadband.

What is Two-position Control?

Two-position control is the most basic kind of process control. A process is controlled by two-position control if it is possible to operate the final control element in only two positions: fully open or fully closed. It's also known as on-off control. When the process variable goes above a specific setpoint, the controller actuates the final control element to the fully open position, and when the process variable goes below a specific setpoint, the controller actuates the final control element to the fully closed position.

Deadband is the region between the upper and lower limits where the final control element doesn't move. It is a kind of threshold region that prevents the final control element from rapidly switching on and off. Deadband is frequently used to avoid oscillations, reduce system wear and tear, and extend system life. It is usually specified as a percentage of the range, and it is represented by the symbol Hysteresis in the block diagram for two-position control. The deadband also serves as a way to reduce the sensitivity of a system to fluctuations in the measurement.

Learn more about process control here: https://brainly.com/question/29318444

#SPJ11

A 4 kg box is at rest on a table. The coefficient of friction are 0.30 and 0.10 for static and kinetic respectively. Then a 10N horizontal force is applied to box.
a. What is the Normal Force acting on the box?
b. What is the value of the Friction Force?
c. What is the Net Force?
d. What is the acceleration of the box?

Answers

a. The normal reaction force(R) is 40N

b. The value of the frictional force is 133N

c. The net force is 123.33N

d. The acceleration of the box is 2.5m/s²

What is coefficient of friction?

Coefficient of static friction is the maximum ratio of applied force to normal force with no motion. Thus the coefficient of kinetic friction is with motion.

a. Normal reaction force= mg

where m is the mass of the object

R = 4 × 10

R = 4 × 10

R = 40N

b. coefficient of friction = normal reaction/ frictional force

frictional force = 40/0.3

= 133.33N

c. The net force= 133.33N -10N

= 123.33N

d. The acceleration of the box = f/m

= 10/4

= 2.5m/s²

learn more about coefficient of friction from

https://brainly.com/question/10907027

#SPJ1

what type of circuit fault is characterized by current bypassing all or some of the electrical load in the circuit?

Answers

Answer:

  short circuit

Explanation:

You want to know what type of circuit fault is characterized by current bypassing all or some of the electrical load in the circuit.

Short

When the current in a circuit follows a shorter (or lower-impedance) path than the one intended, bypassing some or all of the intended load, the circuit is said to suffer from a "short circuit."

What do we call architectural drawings that show the size of the building; the style of the building; and the placement of items such as doors and windows from the side views?
a. Floor Plans
b. Section Drawings
c. Elevation Drawings
d. Digital Drawings

Answers

Elevation drawings are side views that show height. On a building drawing there are standard names for different elevations. so Option C would be the correct answer.

An elevation drawing shows a building from one side. It is a flat, two-dimensional depiction of a single facade. It shows the heights of the development's major features in relation to a fixed point, like the actual ground level.

A building or structure's height, length, width, and appearance are all depicted in an elevation. Elevations give the viewer an idea of how the finished building will look because they are drawn as if looking at a building from the front or side (as opposed to floor plans, which are drawn looking at a building from above).

Visit here to learn more about the elevation drawing: https://brainly.com/question/24220459

#SPJ4

rubber gloves should be worn whenever working on or near the hv circuits or components of a hybrid electric vehicle. technician a says that the rubber gloves should be rated at 1,000 volts or higher. technician b says that leather gloves should be worn over the high-voltage rubber gloves. which technician is correct?

Answers

Technician B is correct. Leather gloves should be worn over the high-voltage rubber gloves when working on or near the HV circuits or components of a hybrid electric vehicle. This is because leather gloves are more durable and provide better insulation than rubber gloves rated at 1,000 volts or higher. Leather gloves can help protect the worker from shocks, cuts, and burns caused by the electric current.

The statement of Technician A and Technician B regarding the rubber gloves and leather gloves that should be worn while working on or near the HV circuits or components of a hybrid electric vehicle are both correct. Therefore, both Technician A and Technician B are correct.

How do hybrid electric vehicles work?

A hybrid electric vehicle (HEV) is a kind of car that combines an electric motor with an internal combustion engine. The goal of the electric motor is to assist the gasoline engine in driving the car while also recharging the battery. In an electric vehicle, an electric motor drives the vehicle's wheels. The electric power that propels the vehicle comes from a battery. A battery is a storage device that converts chemical energy into electrical energy. Hence, it is important that the TECNICIAN working on or near the HV circuits or components of a hybrid electric vehicle must wear rubber gloves that are rated at 1,000 volts or higher. The gloves must fit well and cover the cuffs of the sleeves so that no skin is visible. This is done in order to keep the worker safe from the high voltage electric shock.

The leather gloves, on the other hand, should be worn over the high-voltage rubber gloves.

Rubber gloves should be worn whenever working : https://brainly.com/question/13100557

#SPJ11

Use Wilke-Chang Correlation to estimate the diffusivity of atrazine in water at 20 degrees Celsius. The structure and formula of atrazine can be found on PubChem.

Answers

A safety committee is a group of staff members and management who work together to discover, assess, and control workplace risks as well as to encourage worker awareness of and adherence to safety procedures.

The safety committee is what?

To help establish and maintain a safe workplace, management and employees collaborate on a safety committee. Any factory or industrial facility with 50 or more employees is required by law to have one.

What is the safety committee's purpose?

Safety committees and meetings serve the objective of bringing management and employees together in a non-competitive, cooperative endeavour to advance safety and health. You may keep improving your safety and health programme by using safety committees and meetings.

To know more about management visit:-

brainly.com/question/30468659

#SPJ1

what is the minimum value of capacitance that can be obtained by connecting four 14- μf capacitors in series and/or parallel?

Answers

When capacitors are connected in series, the total capacitance is given by:

1/C_total = 1/C_1 + 1/C_2 + 1/C_3 + 1/C_4

Substituting the values given, we get:

1/C_total = 1/14 + 1/14 + 1/14 + 1/14
1/C_total = 4/14
C_total = 3.5 μF

Therefore, the minimum capacitance that can be obtained by connecting four 14- μf capacitors in series is 3.5 μF.

When capacitors are connected in parallel, the total capacitance is simply the sum of the individual capacitances. Therefore, the minimum capacitance that can be obtained by connecting four 14- μf capacitors in parallel is:

C_total = 4 * 14 μF
C_total = 56 μF

Therefore, the minimum capacitance that can be obtained by connecting four 14- μf capacitors is 3.5 μF in series and 56 μF in parallel.

Learn more about capacitors here:

https://brainly.com/question/29100869

#SPJ11

signment A mass of 500 kg is raised to a height of 6 m in 30s. Find (a) the work done and (b) the power developed

Answers

29,430 J of work is required to raise a mass of 500 kg to a height of 6 m in 30 seconds (Joules).

What is the weight formula based on Newton?

F = m 9.8 m/s2 is the formula for computing weight, where m is the object's mass in kilogrammes and N is the object's weight in Newtons (N). The SI unit for weight is the Newton, and one Newton is equal to 0.225 pounds.

work = force x distance

weight = mass x gravity

weight = 500 x 9.81

weight = 4905 N

Now, we can calculate the work done:

work = force x distance

work = weight x height

work = 4905 x 6

work = 29,430 J

To know more about mass visit:-

https://brainly.com/question/16200632

#SPJ1

the beam is subjected to a moment of 15 kip-ft. determine the percentage of this moment that is resisted by the web d of the beam.

Answers

To determine the percentage of the moment that is resisted by the web of the beam, we need to find the moment of inertia of the entire cross-section of the beam, as well as the moment of inertia of just the web. The moment of inertia of the web represents the portion of the total moment that is resisted by the web.

Assuming a rectangular beam with dimensions b (width), h (height), and t (thickness of the web), the moment of inertia of the entire cross-section can be calculated as:

I_total = (1/12) * b * h^3

The moment of inertia of just the web can be calculated as:

I_web = (1/12) * t * h^3

The moment of the applied load is 15 kip-ft. To determine the percentage of this moment that is resisted by the web, we can use the formula:

% resisted by web = (I_web / I_total) * 100%

Substituting the expressions for I_web and I_total, we get:

% resisted by web = [(1/12) * t * h^3 / (1/12) * b * h^3] * 100%

Simplifying the expression, we get:

% resisted by web = (t/b) * 100%

Therefore, the percentage of the moment that is resisted by the web of the beam is equal to the ratio of the thickness of the web to the width of the beam, multiplied by 100%.

For more questions like percentage visit the link below:

https://brainly.com/question/31215720

#SPJ11

The figure below shows the foundation plan and a wall section for a building. The entire exterior perimeter of the building is to be waterproofed starting 6 inches from the top of the wall, continuing down the wall, and covering the top of the footing. How many square feet of waterproofing is needed for the building? (25 points)

Answers

The correct answer is  I do not have access to any figure or visual representation of the building plan you mentioned. Hence, I am unable to provide an accurate calculation for the required square footage of waterproofing material.

However, I can provide you with a general idea of the steps you need to take to calculate the required square footage. Firstly, you need to determine the total perimeter of the building by adding the length of all sides together. Then, subtract the openings such as doors and windows from the total perimeter.  Next, you need to determine the height of the wall section that needs to be waterproofed. Measure the distance from the top of the wall down to the top of the footing. Once you have the total perimeter and height of the wall section, you can calculate the square footage required for waterproofing. Simply multiply the perimeter by the height of the wall section to get the total square footage. It's also important to consider any additional factors such as overlaps and waste that may affect the amount of waterproofing material needed. Always remember to add a little extra material to ensure adequate coverage and avoid running short during installation.

To learn more about waterproofing material click on the link below:

brainly.com/question/16363151

#SPJ1

an industrial load consists of the following individual loads: a. a 50hp motor with a efficiency of 86% and a 70% lagging power factor (fully loaded). b. a 100hp motor with a efficiency of 89% and a 80% lagging power factor (82% loaded). c. two 20hp motors with a efficiency of 92% and a 85% lagging power factor(fully loaded). d. a 300hp motor with a efficiency of 92% and a 84% lagging power factor(75% loaded). e. 50kw of incandescent lighting. find the total power factor and the real, reactive, and apparent power used by the facility.

Answers

Answer: To find the total real, reactive, and apparent power used by the facility, we need to calculate the power consumption of each individual load first.

Explanation:

a. The power consumed by the 50hp motor is given by:

P = (50 hp) / (0.86 × 0.70) = 83.63 kW

The reactive power consumed by the motor is given by:

Q = P × tan(cos⁻¹(0.70)) = 57.63 kVAR

b. The power consumed by the 100hp motor is given by:

P = (100 hp × 0.82) / 0.89 = 91.01 kW

The reactive power consumed by the motor is given by:

Q = P × tan(cos⁻¹(0.80)) = 54.72 kVAR

c. The power consumed by each of the two 20hp motors is given by:

P = (20 hp) / (0.92 × 0.85) = 25.08 kW

The reactive power consumed by each motor is given by:

Q = P × tan(cos⁻¹(0.85)) = 14.07 kVAR

d. The power consumed by the 300hp motor is given by:

P = (300 hp × 0.75) / 0.92 = 245.11 kW

The reactive power consumed by the motor is given by:

Q = P × tan(cos⁻¹(0.84)) = 160.89 kVAR

e. The power consumed by the incandescent lighting is given by:

P = 50 kW

The reactive power consumed by the lighting is zero, since it is a resistive load.

Now we can find the total real, reactive, and apparent power used by the facility:

Total real power = 83.63 kW + 91.01 kW + 2 × 25.08 kW + 245.11 kW + 50 kW = 529.91 kW

Total reactive power = 57.63 kVAR + 54.72 kVAR + 2 × 14.07 kVAR + 160.89 kVAR + 0 kVAR = 301.98 kVAR

Total apparent power = √(529.91² + 301.98²) = 609.57 kVA

The total power factor is given by:

cos(θ) = 529.91 kW / 609.57 kVA = 0.8691

θ = cos⁻¹(0.8691) = 29.59 degrees

Therefore, the total power factor is 0.869 lagging. The real power used by the facility is 529.91 kW, the reactive power used is 301.98 kVAR, and the apparent power is 609.57 kVA.

SPJ11

Name 4 ways on how to take care of an optical instrument

Answers

Answer:

periscopes, microscopes, telescopes, and cameras.

Answer:

   1. Keep it clean: Use a soft, lint-free cloth or a specialized lens cleaning cloth to clean the lenses of the optical instrument. Avoid using rough materials or paper towels as they can scratch the lenses. Also, be careful when cleaning as some lenses are coated and can be damaged if they come into contact with liquids or certain cleaning solutions.

   2. Store it properly: When not in use, store the optical instrument in a protective case or bag. This will protect it from dust, scratches, and other potential damage. Avoid leaving the instrument in direct sunlight or extreme temperatures, as this can cause the lenses to warp or crack.

   3. Handle it with care: When using the instrument, handle it with care to avoid dropping or knocking it. Many optical instruments are fragile and can be damaged easily. Be particularly careful with any moving parts or delicate mechanisms.

   4. Regular maintenance: Depending on the type of optical instrument, it may require periodic maintenance, such as calibration or alignment. Follow the manufacturer's instructions for maintenance, or consult a professional if you are unsure of how to properly maintain the instrument. Regular maintenance can help to prolong the life of the instrument and ensure that it performs accurately.

A chemical manufacturer is setting up capacity in Europe and North America for the next three years. Annual demand in each market is 2 million kilograms (kg) and is likely to stay at that level. The two choices under consideration are building 4 million units of capacity in North America or building 2 million units of capacity in each of the two loca-tions. Building two plants will incur an additional one-time cost of $2 million. The variable cost of production in North America (for either a large or a small plant) is currently $10/kg, whereas the cost in Europe is 9 euro/kg. The cur-rent exchange rate is 1 euro for U.S. $1.33. Over each of the next three years, the dollar is expected to strengthen by 10 percent, with a probability of 0.5, or weaken by 5 per-cent, with a probability of 0.5. Assume a discount factor of 10 percent. What should the chemical manufacturer do? At what initial cost differential from building the two plants will the chemical manufacturer be indifferent between the two options?

Answers

The chemical manufacturer should choose to build 2 million units of capacity in each of the two locations, as it has a higher NPV

How to make the decision

It should be noted that to make a decision, the chemical manufacturer needs to calculate the present value of each option over the next three years, considering the variable costs of production, exchange rate uncertainty, and discount factor.

Option 1: Building 4 million units of capacity in North America

The total variable cost of production in North America is $10/kg x 2 million kg x 3 years = $60 million. Assuming a 50% probability of a 10% strengthening of the dollar and a 50% probability of a 5% weakening of the dollar over the next three years, the expected exchange rate in three years will be 1.33 x (1 + 0.5 x 0.1 - 0.5 x 0.05) = 1.481175. The total revenue in North America will be 2 million kg x 3 years x $10/kg x 1.481175 = $88.87 million. The net present value (NPV) of building 4 million units of capacity in North America is:

NPV = -Initial investment + PV of net cash flows over three years

NPV = -4 million units x $10/kg x 1.33 + ($88.87 million - $60 million)/(1+0.1)^1 + ($88.87 million - $60 million)/(1+0.1)^2 + ($88.87 million - $60 million)/(1+0.1)^3

NPV = -$53.2 million + $22.8 million + $19.7 million + $17 million

NPV = $6.3 million

Option 2: Building 2 million units of capacity in each of the two locations

The total variable cost of production in Europe is 9 euro/kg x 1.33 x 2 million kg x 3 years = $71.85 million. The net revenue in Europe will be 2 million kg x 3 years x 9 euro/kg = 54 million euro, which is equivalent to $71.82 million at the expected exchange rate in three years. The NPV of building 2 million units of capacity in each of the two locations is:

NPV = -Initial investment + PV of net cash flows over three years

NPV = -2 million units x $10/kg x 1.33 x 2 - $2 million + ($71.82 million - $71.85 million)/(1+0.1)^1 + ($71.82 million - $71.85 million)/(1+0.1)^2 + ($71.82 million - $71.85 million)/(1+0.1)^3

NPV = -$31.92 million - $2 million + $25.46 million + $21.92 million + $18.83 million

NPV = $29.45 million

The chemical manufacturer should choose to build 2 million units of capacity in each of the two locations, as it has a higher NPV of $29.45 million compared to the NPV of $6.3 million for building 4 million units of capacity in North America.

Learn more about NPV on

https://brainly.com/question/18848923

#SPJ1

determine the minimum number of filters needed to treat a flow rate of 2 m3/s if the design loading rate is 200 m3/day-m2. the maximum filter length is 10 m, and the length to width ratio is 1.25 to 1.

Answers

The minimum number of filters needed to treat a flow rate of 2 m³/s if the design loading rate is 200 m³/day-m²,

Determine the minimum number of filters

The key factors that must be considered when designing a filtration system are:

Flow rate - the flow rate of water passing through the filter should be determined. Water passes through a filter more quickly if it has a higher flow rate.

Loading rate - the loading rate of the filter is the volume of wastewater that is treated in a specific period. It must be calculated because it has a significant impact on the efficiency of the filter.

Filter media - The appropriate filter media should be selected depending on the impurities to be removed from the water. Sand, gravel, activated carbon, and diatomaceous earth are some of the media that can be used in a filter.

Size of the filter - A filter's size is determined by the flow rate and loading rate. The filter's surface area and depth are both important.

Length to width ratio - This ratio is important because it determines the filter's shape, which affects the uniformity of flow and filtration performance.

The minimum number of filters needed to treat a flow rate of 2 m³/s if the design loading rate is 200 m³/day-m², the maximum filter length is 10 m, and the length to width ratio is 1.25 to 1 is 4 filters.

Learn more about loading rate at

https://brainly.com/question/23846273

#SPJ11

a signal is to be sampled at 1 khz. to prevent aliasing, the signal should first be passed through an anti-aliasing filter with a cutoff frequency of:

Answers

To prevent aliasing, the anti-aliasing filter's cutoff frequency should be less than half of the sampling frequency (Nyquist frequency). Therefore, for a signal to be sampled at 1 kHz, the cutoff frequency of the anti-aliasing filter should be less than 500 Hz.

When sampling an analog signal, it is important to ensure that the resulting digital signal accurately represents the original signal. Aliasing can occur when the signal is not properly sampled, resulting in distortion or errors in the digital signal.

To prevent aliasing, an anti-aliasing filter is used to remove any frequency components above the Nyquist frequency, which is half the sampling rate. In this case, the signal is to be sampled at 1 kHz, so the Nyquist frequency is 500 Hz.

Therefore, the cutoff frequency of the anti-aliasing filter should be set at or below 500 Hz to prevent any frequency components above the Nyquist frequency from being sampled and causing aliasing. A good rule of thumb is to set the cutoff frequency at about 70% of the Nyquist frequency, so a cutoff frequency of around 350 Hz would be appropriate in this case.

Learn more about aliasing here brainly.com/question/14983964

#SPJ4

DeliveryTruck: Implement a class called DeliveryTruck with a single member variable of type Mail[] of length 10. Add the following method: o void load(Mail mail): This method stores the given mail argument at the next available spot in the member variable

Answers

The Delivery Truck class is designed to manage a collection of Mail objects. It has a single member variable called mail_list, which is an array of length 10 that holds the Mail objects.

The load method takes a Mail object as an argument and stores it in the mail_list array at the next available spot. It does this by checking the current value of a member variable called next_available_spot, which keeps track of the index of the next available spot in the array. If there is space in the array, the Mail object is stored at the index indicated by next_available_spot, and next_available_spot is incremented. If the array is full, the load method does not add the Mail object and returns an error message or raises an exception.

To know more about mail_list click here:

brainly.com/question/20435559

#SPJ4

an engineering notebook is used for documenting all research, proving the origin of an idea, keeping sketches in one place, and a personal calendar. group of answer choices true false

Answers

The given statement "an engineering notebook is used for documenting all research, proving the origin of an idea, keeping sketches in one place, and a personal calendar" is true because an engineering notebook is a type of journal or logbook used by engineers.

It is often used to track the evolution of a project or to prove the origin of a particular concept or invention. In addition to keeping sketches in one place and serving as a personal calendar, an engineering notebook is also useful for maintaining accurate records and staying organized.

An engineering notebook is a written record of an engineer's ideas, observations, designs, and experiments. It serves as a legal document that provides evidence of the engineer's work.

Learn more about engineering notebook: https://brainly.com/question/11250014

#SPJ11

A dwelling with a general lighting load of 10,000 VA requires a minimum of how
many 15 A branch circuits?
A. 8
B. 3
C. 10
D. 6

Answers

Explanation:

The calculation is as follows:

The general lighting load is 10,000 VA.

The voltage used in homes is typically 120 volts.

Dividing the general lighting load by the voltage gives us the amperage: 10,000 VA / 120 volts = 83.33 amps

According to the National Electrical Code (NEC), a 15-amp branch circuit can handle a maximum of 15 amps.

To determine the number of 15-amp branch circuits required, we divide the amperage by the maximum allowed on one circuit: 83.33 amps / 15 amps = 5.55

Therefore, we need at least 6, 15-amp branch circuits to handle the general lighting load of 10,000 VA.

The answer is (D) 6.

What is the major cause of overflowing drains?

Answers

Answer:Overflowing drains are often caused by sanitary products, paper towels or other hard to flush materials which can clog pipes and obstruct drains. Wipes, tissues, and even hair can also be the culprits

Explanation:

when unloading, why is the unloading curve parallel to the elastic portion of the loading curve in most metals?

Answers

In most metals, the deformation brought on by the applied stress is totally recoverable up to the yield point, hence the unloading curve is parallel to the elastic component of the loading curve.

The loading line and unloading line are parallel because of what?

Metal wires have identical loading and unloading curves as long as their elastic limit is not exceeded. indicating that after being discharged, the wire stretches back to its initial length. The unloading line, on the other hand, is parallel to the loading line when it reaches the elastic limit.

What causes a distinct loading and unloading curve?

As a rubber band is unloaded, it can stretch back to its original length. However the loading curve is always followed by the unloading curve.

To know more about stress visit:-

https://brainly.com/question/30128830

#SPJ1

technician a says most turbochargers have their own, self-contained, lubrication system. technician b says a turbocharger should not be operated at an engine oil pressure lower than 30 psi. who is correct?

Answers

The technician B is correct in this case since a turbocharger should not be operated at an engine oil pressure lower than 30 psi.

What is Turbocharger?

A turbocharger is a device that increases the efficiency of an engine by forcing air into it at a higher pressure. It increases the engine's power and efficiency by supplying it with additional oxygen.Turbochargers are used in both petrol and diesel engines. They are most commonly found in large diesel engines.

It is also used in motorsports, where it is used to improve engine efficiency and power output.Turbochargers are lubricated by engine oil, and most turbochargers have their lubrication system. A turbocharger cannot be operated at an engine oil pressure lower than 30 psi, which can cause damage to the engine's parts.

A turbocharger's lifespan is determined by how well it is maintained, as well as the quality of the oil being used. It is advised to keep your vehicle serviced and your oil changed regularly to keep your turbocharger running smoothly.

Learn more about turbocharger at

https://brainly.com/question/21306559

#SPJ11

Please fam., help me solve this microscopy question. I have tried everything but all to no avail. Attached Is an image of the question. Thanks I'm advance

Answers

Answer:

all you have to do is describe the features of it

Explanation:

just look at it pic on the right and wright down what you see

What is the solution to this?

Answers

A gravitational force of 4.93 10-12 N in the positive x-direction is applied by the copper sphere to the steel sphere.

How can you determine the force's direction between two charges?

Along the line connecting the centres of the two objects, the force is applied. Coulomb's law has an undesirable effect if the two charges have opposing signs. This indicates that there is an attractive force acting on the particles.

[tex]F = G * m1 * m2 / r^2[/tex]

[tex]m = rho * (4/3) * pi * r^3[/tex]

r = 65 mm = 0.065 m

a = 3.7r = 0.241 m

b = 2.1r = 0.137 m

c = 0.6r = 0.039 m

m_copper = rho_copper [tex]* (4/3) * pi * r^3[/tex]

[tex]= 8,960 kg/m^3 * (4/3) * pi * (0.065 m)^3[/tex]

= 0.0138 kg

m_steel = rho_steel [tex]* (4/3) * pi * r^3[/tex]

= [tex]7,860 kg/m^3 * (4/3) * pi * (0.065 m)^3[/tex]

= 0.0119 kg

F = G  m_copper  m_steel / [tex]r^2[/tex]

= [tex]6.674 × 10^-11 N·(m/kg)^2 * 0.0138 kg * 0.0119 kg / (0.065 m)^2[/tex]

[tex]= 4.74 × 10^-11 N[/tex]

u = (0.241 - 0.137)i + 0j + 0k

= 0.104i + 0j + 0k

So the gravitational force F can be expressed as:

[tex]= 4.74 × 10^-11 N[/tex]

[tex]= 4.74 × 10^-11 N[/tex]

To know more about force visit:-

https://brainly.com/question/30478824

#SPJ1

Other Questions
4. An ice cube at 0.00 C is placed in your dog's dish which contains 2500.0 grams of water at 27.0C on a warm day. After the ice melts in your dog's extremely well insulated dog bowl, you note that the temperature of the water in the bowl has dropped to 18.0 C. What was the mass ofthe ice cube? Suppose you see a net for a rectangular prism and a net for a rectangular pyramid.explain how you can match each net with its name what safety precautions do you need to take when working with dichloromethane? For what values of x is the series n!x5n convergent? n=0 SOLUTION We use the Ratio Test. If we let an, as usual, denote the nth term of the series, then a, = n!x5n. If x # o, we have lim an + 1 an lim n00 n!x5n = lim n00 By the Ratio Test, the series diverges when x + 0. Thus the given series converges only when x = which statement describes the characteristics of packet-filtering and stateful firewalls as they relate to the osi model? complete page for 60 points (Spanish) English 12 sem 2 3.4.3 test answers? What do I need to fix?? the australian sheep dog is a breed renowned for its intelligence and work ethic. it is estimated that 45% of adult australian sheep dogs weigh 65 pounds or more. a sample of 16 adult dogs is studied. what is the probability that no more than 3 of them weigh 65 lb or more? a 62.3 kg base runner begins his slide into second base while moving at a speed of 4.05 m/s. he slides so that his speed is zero just as he reaches the base. the acceleration of gravity is 9.8 m/s 2 . what is the magnitude of the mechanical energy lost due to friction acting on the runner? answer in units of j. a number of years ago, kayla acquired an interest in a partnership in which she is not a material participant. kayla's basis in her partnership interest at the beginning of 2021 is $40,000. kayla's share of the partnership loss is $35,000 in 2021, and her share of the partnership income is $15,000 in 2022. how much may kayla deduct in 2021 and 2022, assuming that she owns no other passive activities? What do you believe is at the root behavior of bullying it is possible to reduce the number of lies that people tell within an organization without using punishments such as terminations. group of answer choices true false Which two sentences best support the point that life in Jamestown was difficult Giving brainliest.please help asap if you analyze the sequences of the two copies of any of the chromosomes shown in the karyotype, there would be slight sequence differences. what could account for the small differences between a few of the homologous chromosomes? What is the resonant frequency of a series-tuned LC circuit that contains a 2 mH inductor and a 30 F capacitor? (Round your answer to the nearest Hz.)A. 278 HzB. 550 HzC. 420 HzD. 650 Hz helpp asapp!!!!!!!!!!! What is one way that everyday citizens can address the problem of plastic waste?dispose of plastic in a biodegradable wayenact legislation against single-use plasticcreate a new policy related to recyclingresearch the issue online to learn more Decompose the composite figure to find its total area.