A network has only one critical path and the slack for noncritical activities is high. This network would appear to have a _______ level of sensitivity

Answers

Answer 1

The network would appear to have a low level of sensitivity if it has only one critical path and the slack for noncritical activities is high.

What is critical path of a network?

The Critical Path helps identify the most important sequence of tasks in a project which can be used by managers to reduce delay.

Also, critical path allows teams to identify the most important tasks in a project thereby providing a higher level of insight into a project's timeline.

Hence, the network would appear to have a low level of sensitivity if it has only one critical path and the slack for noncritical activities is high.

Learn more about critical path of a network here: https://brainly.com/question/13500584


Related Questions

An example of policies designed to encourage new local industries serving the domestic market would be subsidizing imports to the domestic market. removing all trade restrictions and price supports. imposing import tariffs or otherwise restricting imports. taxing exports of manufactured goods.

Answers

Policies designed to encourage new local industries serving the domestic market would be C. imposing import tariffs or otherwise restricting imports.

What are import restrictions?

Import restrictions are trade protective policies enunciated to protect companies and workers in a home economy from foreign competition.

As a trade barrier, import restriction restricts the importation of goods and services produced in foreign countries so that local industries could survive and become internationally competitive.

Thus, an example of policies designed to encourage new local industries serving the domestic market would be C. imposing import tariffs or otherwise restricting imports.

Learn more about import restrictions at https://brainly.com/question/1129630

#SPJ1

Answer the following questions. For getting full mark - try not to copy paste from the notes.

1. What is the difference between interstate and intrastate commerce? [2 marks]
2. What are the ways that the government can deal with a monopoly? [2 marks]
3. What kinds of property are protected by copyrights? [2 marks]

MATH SKILLS
Frank and his wife Mara have separate investment accounts. Frank’s account has $7,680 invested in stocks and $2,560 in bonds. Mara’s total investment in stocks and bonds is $4,000 split in the same proportion as her husband’s. Write and solve a proportion to calculate how much Mara has invested in bonds. [4 marks]

Proportions
A proportion is an equation with equivalent ratios on each side. When one of the four numbers in a proportion is unknown, the proportion may be solved by using cross products to find the unknown number. Question marks or letters are frequently used in place of the unknown number.

Answer Hint:
Mara has $1,000 invested in bonds. To find the unknown value that represents the value of Mara’s bond investment, you need to know the proportion of Frank’s bond investment. Set up this equation:

Frank’s Total ÷ Frank’s Bonds = Mara’s Total ÷ Mara’s Bonds
$10,240 ÷ $2,560 = $4,000 ÷ ?
4 = $4,000 ÷ ?
$1,000 = ?

Answers

Answer:

1. You are engaging in Interstate commerce by transporting goods across state lines. Intrastate trucking means that you drive your commercial motor vehicle only within a state's boundaries and that you do not fit any of the other descriptions of interstate commerce.

2. The government can regulate monopolies through: Price capping – limiting price increases. Regulation of mergers. Breaking up monopolies.

3. Copyright, a form of intellectual property law, protects original works of authorship including literary, dramatic, musical, and artistic works, such as poetry, novels, movies, songs, computer software, and architecture.

(NOT GOOD AT MATHS LOL)

The increase in total revenue that results from selling one more unit of output is.

Answers

The increase in total revenue that results from selling one more unit of output is the marginal revenue

Hope that helps!

6. Responsible for the production of finished products:
O A. Manufacturer
B. Distributor
O C. Driver
O D. Seller

Answers

Answer:

The answer is A. Manufactuer

Explanation:

The manufacturer makes the item.

The manufacturer is responsible for the production of finished products. Thus, option A is appropriate.

A manufacturer is a person or business that turns raw materials into finished products using a variety of tools, machinery, and procedures, and then sells those products to customers, retailers, wholesalers, distributors, or other manufacturers who can use them to make more complicated products.

A manufacturer is an individual or organization that converts raw materials into finished goods and sells them to customers using a variety of tools, machinery, and procedures.

One of the most important economic sectors is manufacturing. It creates products that people require to survive and provides for their comfort.

Thus, option A is appropriate.

Learn more about the Manufacturer here:

https://brainly.com/question/33621434

#SPJ4

Kohl’s is addressing the increasing importance of technology in the retail experience by investing in.

Answers

Kohl’s is addressing the increasing importance of technology in the retail experience by investing in E. All of the above.

What is technology?

It should be noted that technology simply means the application of science to a particular course.

From the complete question, Kohl’s is addressing the increasing importance of technology in the retail experience by investing in digital promotion, self checkout, etc.

Learn more about technology on:

https://brainly.com/question/25110079

FAB has three partners, Ramon, Janna, and Jackie, and $20,000 in assets when it begins its winding-up process. FAB owes $20,000 to a supplier, $25,000 on a bank note, and $5,000 to Jackie for a loan she gave to the partnership. FAB does not have a partnership agreement. What financial rights and obligations does Jackie have

Answers

Assuming FAB has three partners, Ramon, Janna, and Jackie, and $20,000 in assets when it begins its winding-up process. The financial rights and obligations that Jackie have is: b. Jackie must pay a net amount of $5,000.

Net amount

Using this formula

Net amount=Bank note -Assets

Where:

Bank notes=$25,000

Assets=$20,000

Let plug in the formula

Net amount=$25,000-$20,000

Net amount=$5,000

Inconclusion the financial rights and obligations that Jackie have is: b. Jackie must pay a net amount of $5,000.

Learn more about net amount here:https://brainly.com/question/15530787

The information that is shared in the communication process is called the ______.

Answers

Answer:

The answer is The Message.

Explanation:

The information that is shared in the communication process is called the The Message.

Sally’s parents deposited $15,000 into a college savings account on her third birthday. the account had an interest rate of 9.6% compounded annually. they were hoping that the money would double twice by the time she was 18 years old. using the rule of 72, t = startfraction 72 over r endfraction will their hopes come true? yes, the $15,000 will double each 7.5 years. in 15 years, it will double twice. yes, the $15,000 will double in 7.5 years and be four times as much in 15 years. no, the $15,000 will only double once in 15 years, not double twice. no, it will take 30 years for the $15,000 to double twice.

Answers

Answer:

The answer is $53724.27. If you rounded up.

Answer:

A. Yes, the $15,000 will double each 7.5 years. In 15 years, it will double twice.

Explanation:

Edge 22'

what is the value of product portfolio?

Answers

Answer:

Product portfolio analysis can provide nuanced views on a stock type, company growth prospects, profit margin drivers, income contributions, market leadership, and operational risk. This is essential for investors conducting equity research by investors or analysts supporting internal corporate financial planning.

A(n) _____ in government spending, a _____ domestic currency, and _____ interest rates will shift the aggregate demand curve to the left.

Answers

A(n) decrease in government spending, a stronger domestic currency, and higher interest rates will shift a country's aggregate demand to the left.

What is a country's aggregate demand?

Aggregate demand is a measurement of the total amount of demand for all finished goods and services produced in an economy. Aggregate demand is expressed as the total amount of money exchanged for those goods and services at a specific price level and point in time.

Therefore, the answers to the gaps are disease, stronger and higher.

learn more about a country's aggregate demand: https://brainly.com/question/1490249

Dobson Company hires John to work on Dobson's shipping dock, accepting deliveries and dealing with other companies' drivers. With respect to Dobson, John is most likely

Answers

Dobson Company hires John to work on Dobson's shipping dock, accepting deliveries and dealing with other companies' drivers. With respect to Dobson, John is most likely an agent.

Who is an agent?

This is a term that is used to refer to a person that carries out assignments or work on behalf of another person or group.

The company is a party that hired John to do this work on their behalf. Hence John is an agent.

Read more on agency here: https://brainly.com/question/23534924

At December 31, the records of Kozmetsky Corporation provided the following selected and incomplete data: Common stock (par $2; no changes during the current year). Shares authorized, 5,000,000. Shares issued, ? ; issue price $7 per share. Shares held as treasury stock, 11,700 shares, cost $5 per share. Net income for the current year, $400,660

Answers

If the common stock account is $143,000 the shares issued is 71500 shares and shares outstanding is 59800 shares.

Shares issued and shares outstanding

Shares issued= Common stock account / par value per share

Shares issued = $143,000 / $2

Sharesd issued= 71500 shares

Shares outstanding = Shares issued - Shares in treasury

Shares outsatnding= 71500 - 11700

Shares outstanding=59,800 shares

Therefore the shares issued is 71500 shares and shares outstanding is 59800 shares.

Learn more about Shares issued and shares outstanding here:https://brainly.com/question/25630152

A mortgage banker operating as a correspondent lender typically does not have his own funds to lend, so he establishes a line of credit with commercial banks that is called

Answers

A mortgage lender is a mortgage banker operating as a correspondent lender who establishes a line of credit with commercial banks.

What is mortgage lender?

A mortgage lender serves as a financial institution which offers and underwrites home loans.

These mortgage Lenders posses some specific borrowing guidelines and they do establishes a line of credit with commercial banks.

Learn more about mortgage lender at;

https://brainly.com/question/1318711

The following are all functions of money except A. medium of exchange B. store of value C. unit of account D. illiquid asset

Answers

Answer:

Explanation:

D: The whole point of money is that it is not illiquid. It must be easily transferred. This is never the function of money and so D is your answer.

A: Money is a medium of exchange. I'll give you 5$ if you will give me a one way bus pass.

B: Though we are going to have doubts about this in the future, money should have some value and the closer to being constant, the better.

C: There should be some way of making money in small enough and large enough that transactions are accomodated. If you buy a truck for 60000 dollars, the 60000 tells you how many units the truck costs.

President george washington instituted a tax on what alcohol product?.

Answers

Answer:

New England run and frontier whiskey

goal of a strategic position is to create the largest gap possible between the ________ that a firm creates through its offerings and the ________ required to create these offerings.

Answers

The goal of a strategic position is to create the largest gap possible between the value that a firm creates through its offerings and the cost required to create these offerings.

What is Strategic positioning?

Strategic positioning help the company to makes some kind of value thar is needed to achieve the organizational goals.

Therefore, Strategic positioning is a key aspect of the company for great development.

Learn more about Strategic positioning at;

https://brainly.com/question/2847405

While shopping online at Amazon, you are given the option of free shipping if you add just six more dollars to your current total. This sales promotion appeal is analogous to the rack of candy bars and gum at a grocery store's checkout aisle, which is known as ______

Answers

Answer:

a point-of-purchase display

Explanation:

What can be traded in a commodities market? stock bonds oil debt

Answers

Answer: C ,oil

Explanation:

did the test

The Oil can be traded in a commodities market.

Why oil can be traded in a commodities market?Oil trading is the selling and buying of various types of oil and oil-related substance to make a profit. Oil is a finite resource, its price can fluctuate wildly due to changes in supply and demand. This volatility makes it extremely familiar among traders. Crude oil is a global commodity that is traded in markets around the world, both as spot oil and through derivative contracts.

To learn more about Oil trade refer to:

https://brainly.com/question/24821138

#SPJ2

The organization that works with companies on recalls of unsafe products (such as lead-paint laden Thomas the Train toys) is

Answers

The organization that works with companies on recalls of unsafe products is known as The Consumer Product Safety Commission (CPSC)

What is Consumer Protection?

This refers to the agency or body that is charged with the quality of goods and/or services that consumers buy and use.

Hence, we can see that the Consumer Product Safety Commission (CPSC) in America is the agency that is charged with helping with the safe recall of defective or unsafe products to protect the consumers.

Read more about consumer protection here:

https://brainly.com/question/15216453

The combination of print advertisements, commercials, special offers, promotions, and displays of a product are all part of the product’s marketing or advertising _____.

indicators
campaign
structure
consternation

Answers

Answer: i believe its B) “structure”

Explanation: might be wrong but its the only one that makes since based on definition .

In the global financial crisis box in section​ 6.2, bloomberg reported that the​ three-month treasury bill sold for a price of $100.002556 per $100 face value. what is the yield to maturity of this​ bond, expressed as an​ ear?

Answers

Based on the price the three-month treasury bill was sold at, and the face value, the yield to maturity as an EAR would be -0.010223%.

What is the yield to maturity as an EAR?

First find the 3 month yield to maturity:

= Face value / Sale value

= 100 / 100.002556

= -0.002556%

Expressed as an EAR, this is:

= (1 - 0.002556/100.002556)⁴ - 1

= -0.010223%

The Annual yield to maturity would be:

= -0.002556% x 3 / 12 monts

= -0.010224%

Find out more on EAR at https://brainly.com/question/6623488.

Which of the following must be present in order for the aggregate supply curve to form an upward slope?
a. constant price level for intermediate goods and services
b. rise in aggregate quantity of supplied goods and services
c. fixed cost of inputs combined with rising prices for outputs
d. the lure of higher profits to induce continued production

Answers

The fixed cost of inputs combined with rising prices for outputs is the item that must be present for the aggregate supply curve to form an upward slope.

What is the aggregate supply curve?

The supply curve on the supply graph depict the total quantity of goods and services that is supplied by all producers in country.

When an upward slope is formed on am aggregate supply curve, its shows positive relationship between price level and real GDP in the short run.

Therefore, the Option C is correct.

Read more about aggregate supply curve

brainly.com/question/13867740

Why does each monopolistically competitive firm generally have limited control over market price?.

Answers

Answer:each firm has a relatively small percentage of the total market

Explanation:

What is the cost when someone borrows money from someone else?.

Answers

The cost when someone borrows money from someone else is known as interest.

What is interest?

Interest rate is the cost of borrowing. It is the amount the borrower pays the lender for use of their funds. It is usually a function of the amount borrowed, length of the loan and the interest rate.

For example, if a person borrows $1000 for 1 year at an interest rate of 10, the interest that would be paid is: $1000 x 0.1 = $100.

To learn more about interest rate, please check: https://brainly.com/question/14935026

f the market price is $5, the firm will earn a. negative economic profits in the short run but remain in business. b. zero economic profits in the short run. c. positive economic profits in the short run. d. negative economic profits and shut down.

Answers

Given the information, the firm will earn a negative economic profits in the short run but remain in business if the market price is $5.

What is a negative economic profits?

This is an recorded profit that occurs when the cost of equity capital exceeds the accounting profit in a firm.

Hence, as its records a negative economic profit. the firms have the cause to leave the market because since its resources would be more profitable elsewhere.

Therefore, the Option A is correct.

Read more about negative economic profit

brainly.com/question/27246310

Leah trades some of her homegrown peppers to her neighbor, Charlie, for some tomatoes fresh from his garden. This type of trade represents an example of Multiple Choice direct exchange. tax avoidance. e-commerce. barter.

Answers

Barter is the type shown in the statement as Charlie, Leah's neighbor, trades some of her homemade peppers for tomatoes from his garden. They are just exchanging goods in return of goods.

What is Barter system?

Bartering is the exchange of products or services between two or more individuals without the use of money or a monetary mechanism like a credit card.

Trading is defined as a transaction in which one party provides one good or service in exchange for another party's provision of a different good or service.

Thus, option D, Barter is correct.

For more details about barter system, click here:

https://brainly.com/question/23414827

Your renter's insurance policy costs $20/month and has a $1,000 deductible. A thief breaks into your apartment and steals your $800 TV set. How much would your insurance company pay?

Answers

Answer:

the answer is undefined because there is no given month but given the information.. the insurance company would have to pay 800$ to replace the TV set.

The insurance company pays zero amount.

What is a renter's insurance policy?

A renters insurance policy is a collection of coverages meant to protect tenants who live in a house or flat. After a covered loss, a typical renters insurance policy offers three categories of coverage to help protect you, your property, and your living arrangements.

Given:

Insurance policy costs $20/month

Deductible amount=$1,000

Theft= $800

As the deductible amount is $1000 and the theft amount is $800 which is less than the deductible amount so the insurance company will not pay any amount i.e Zero.

Therefore, the above explanation describes the renter's insurance policy.

Learn more about the renter's insurance policy here:

https://brainly.com/question/13024449

The Fair Labor Standards Act was originally intended to cover employers engaged in Multiple Choice intrastate commerce only. any and all commerce, including foreign commerce. both intrastate and interstate commerce. interstate commerce only.

Answers

The Fair Labor Standards Act was originally intended to cover employers engaged in interstate commerce only.

What is the  Fair Labor Standards Act ?

This is the labor act in the United States that is used to establish the minimum wage as well as the overtime pay of the workers in the country.

It is a federal law that is also applicable to record keeping in the nation. It protects workers from unfair wages.

Read more on labor acts here: https://brainly.com/question/19832789

Why might a country choose to devalue its currency? to please its trading partners to encourage exports to encourage imports to reduce taxes

Answers

The major reason a country might choose to devalue its currency is to encourage exports.

What do you mean by Devaluation?

Devaluation refers to the downward movement in the value of the country's currency. The government that issues the currency has the power to devalue its currency.

Devaluating the currency reduces the cost of a country's exports and reduces trade deficits. For encouraging exports, a country chooses to devalue the currency.

Therefore, B is the correct option.

Learn more about Devaluation here:

https://brainly.com/question/15293218

Answer:

B) to encourge exports

Explanation:

edge

A firm offloads some of its production costs to 3rd parties. This would contribute to market failure because:

Answers

When a firm offlaods some of its production costs to 3rd parties, it contributes to market failure becaue it leads to negative externality.

What is negative externality?

A firm generates negative externality when the cost of the production activities is greter than the benefits to third parties not involved in production. An example of an activity that generates negative externality is pollution.

To learn more about externalities, please check: https://brainly.com/question/26266710

Other Questions
A random sample of 20 students yielded a mean of x 72 If you drive 23 miles south, make a turn and drive 39 miles east, how far are you, in a straight line, fromyour starting point? Round your answer to the nearest tenth of a mile. What do you prefer: agricultural country or industrialized country? Why? Use ABC to find the value of sin A12/3535/3737/1212/37 why is the speed of these particles deffirent in each state If you pull on a box with a force of 5 N and your teacher pulls on the same box with a force of 5 N in the opposite direction, the net force on the box is _______. View Available Hint(s)for Part A 0 N 5 N 50 N 10 N Why does the author include the example of harvesting submerged trees?To highlight new uses of technologyTo point out how much timber is wastedTo emphasize the importance of sonar in forestryTo recommend the use of this technique in other aspects of the industry she said , " We went swimming today " change it to indirect speech What european countries had colonies in the caribbean?. You have a first aid kit and are about to give care to a co-worker who is unresponsive and not breathing. After calling 9-1-1 and getting equipment, what should you do before giving care, if possible A combination burglary/fire alarm system listed for household use may be used in a small mercantile occupancy.A. TrueB. False Please do number 3 or number 5 how has figure DEF been transformed to figure ABC Do you think affirmative action is an effective way to guarantee minorities access to higher education? Why or why not?Explain Yan had 5 trading cards, and then his friend gave him more cards. Now he has 16 trading cards. Let t represent the number of cards his friend gave him. Write both an addition equation and a subtraction equation to model the problem.PLEASE ANSWER IN THE NEXT 1 MINUTE. BRAINLIEST TO CORRECT ANSWER!!!!A circular garden has a diameter of 12 yards. What is the area of the garden? Use 3.14 for pi. O A. 452.16 ydO B. 56.52 ydO C. 113.04 ydO D. 37.68 yd Dr. roberts conducts a study in which one group of participants counts the number of syllables in each member of a list of twenty words, and the second group creates stories from the same set of words. when later asked to write down as many of the previously seen words as possible, the second group of participants recalls more words than the first group. this study shows the importance of the pragmatics of language the pragmatics of language semantic encoding semantic encoding maintenance rehearsal maintenance rehearsal convergent thinking convergent thinking shallow processing -3 and -1/2 form quadratic polynomial The cornerstone of lyndon johnsons war on poverty was which program?. If you start with the equation x-6, what equation do you have when you add 3 to both sides